Frequency domain resource scheduling method and device
A frequency-domain resource scheduling and frequency-domain resource technology, applied in the field of frequency-domain resource scheduling methods and devices, can solve the problems of slow processing speed and low efficiency, and achieve the effect of improving scheduling speed and efficiency and reducing time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0090] Example 1: The scheduling parameter value corresponding to the scheduling function is: resource allocation type 0, new packet, single codeword, and codeword that has not been scheduled; at this time, the implementation process of frequency domain resource scheduling for UE described in this step like Figure 6 shown, including:
[0091] Step 601: Obtain the first subband in the subband set with the largest CQI value;
[0092] Step 602: Judging whether the two RBGs of the current subband are both occupied, if yes, acquire the next subband, and perform the judgment in step 602; otherwise, execute step 604.
[0093] Wherein, the acquisition of the next subband has different processing in different situations:
[0094]Wherein, when the current subband is the last subband in the subband set, then the acquisition of the next subband is the first subband in the subband set corresponding to the acquisition (current CQI value-1);
[0095] And when the current subband is not t...
example 2
[0112] Example 2: The scheduling function is: resource allocation type 1, new packet transmission, single codeword, and no scheduling has been performed on this codeword before; at this time, the implementation process of frequency domain resource scheduling for UE described in this step is as follows Figure 7 shown, including:
[0113] Step 701: Obtain the first subband in the subband set with the largest CQI value;
[0114] Step 702: Judging whether there is an idle PRB in the current subband, if yes, execute step 703; otherwise, acquire the next subband, and execute the judgment in step 702.
[0115] Wherein, the acquisition of the next subband has different processing in different situations:
[0116] Wherein, when the current subband is the last subband in the subband set, then the acquisition of the next subband is the first subband in the subband set corresponding to the acquisition (current CQI value-1);
[0117] And when the current subband is not the last subband ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com