Balance bridge at entrance and exit of main and auxiliary roads and method for easing traffic jam
A technology of import and export, balance bridge, applied in the direction of roads, roads, buildings, etc., can solve problems such as reducing road traffic efficiency, and achieve the effect of improving road traffic congestion, reducing travel costs, and alleviating road traffic congestion
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] like figure 2 As shown, the main and auxiliary road import and export balance bridge of the present embodiment is arranged at the junction of the main road 4 and the auxiliary road 5, which includes an outlet channel 1, an inlet channel 2 and a balance bridge body 3; the outlet channel 1 and the inlet channel 2 Either one of the two is arranged on the balance bridge body 3 along the upper surface 31 of the balance bridge body 3, and the other is located below the upper surface 31 of the balance bridge body 3; The driving direction extends from the main road 4 to the auxiliary road 5 , and the entrance passage 2 extends from the auxiliary road 5 to the main road 4 along the vehicle traveling direction. The road surface of the outlet channel 1 or the inlet channel 2 located below the upper surface 31 of the balance bridge body 3 is arranged along the ground where the main road 4 and the auxiliary road 5 are located.
[0031] like image 3 As shown, in order to reduce t...
Embodiment 2
[0036] like figure 2 As shown, utilize the main and auxiliary road import and export balance bridge described in embodiment 1 to alleviate the method for road traffic jam, comprise the steps:
[0037] (a) at the junction of the main road 4 and the auxiliary road 5, an under-bridge driving passage connecting the main road 4 and the auxiliary road 5 is set, and the road surface of the under-bridge driving passage is along the main road 4 and The ground construction setting where the auxiliary road 5 is located;
[0038] (b) The balance bridge body 3 connecting the main road 4 and the auxiliary road 5 is arranged above the driving passage under the bridge. The balance bridge body 3 can be prefabricated in a workshop or factory, and then transported to The construction site is directly installed in place, which greatly shortens the construction period and facilitates construction;
[0039] (c) On the balance bridge body 3, a bridge that enters the auxiliary road 5 from the main...
PUM
Property | Measurement | Unit |
---|---|---|
Width | aaaaa | aaaaa |
Height | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com