Ballasting method in large-span girder cantilever construction

A mid-construction, long-span technology, applied to bridges, bridge construction, erection/assembly of bridges, etc., to achieve the effect of saving materials and not occupying the operating space of steel beams
CN102493364BActive Publication Date: 2014-01-15CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD
Publication Date
2014-01-15

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention discloses a ballasting method in large-span girder cantilever construction. The ballasting method comprises the following steps of: A10, constructing an enlarged foundation of temporary piers for a side span girder, and arranging an embedded steel strand; A20, constructing the temporary piers on the enlarge foundation; A30, detaching the temporary piers after the side span girder is erected; A40, mounting distributive girders on a bridge deck of the side span girder, and making a steel strand pass through drain holes on the bridge deck of the side span girder and fixedly connected with the embedded steel strand; A50, when the factor of safety against overturning of the girder cantilever is less than 1.3, beginning ballasting, tensioning the steel strand by using a tensioning jack arranged on the bridge deck of the side span girder, lifting the enlarged foundation, and anchoring the upper end of the steel strand to the distributive girders to ballast the side span girder; and A60, after a girder is folded, descending the enlarged foundation by using the tensioning jack and the steel strand to unload the ballast. By the method, the enlarged foundation is integrated with a ballasting material, and the method has the advantages of saving materials, not occupying girder operating space, not influencing the jacking and drop and longitudinal shift of the girder, and the like.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to a bridge construction method, in particular to a weight method in the cantilever construction of a large-span steel girder. Background technique

[0002] During the steel beam construction process, the side spans are generally erected with temporary support piers to assist the cantilever erection. After the side span steel beam cantilever is erected to the main pier, the full cantilever erection is carried out. Finally, the middle span is closed by jacking down and longitudinally moving the steel beam. When the cantilever length of the steel girder is large, it is necessary to press on the side span to meet the requirement of anti-overturning stability safety factor K≧1.3.

[0003] There are two traditional weighting methods:

[0004] (1) Physical weight. Water tanks or concrete, steel and other objects are used for ballasting on the bridge deck or on the top chord of the steel girder. The advantage of this method is that the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More