Fixed asset project management system based on geographic information system

A technology of project management system and geographic information system, applied in resources, data processing applications, calculations, etc., can solve problems such as inconvenience in project management

Inactive Publication Date: 2013-03-13
大连恒基电子技术有限公司
View PDF0 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In the face of the ever-increasing project management work, if no informatization measures are taken...

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Fixed asset project management system based on geographic information system
  • Fixed asset project management system based on geographic information system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0020] Such as figure 1 and figure 2 The project management system of fixed assets based on geographic information system is shown. The technologies used in this project are management information system, large-scale image and text database management, geographic information system, GPS satellite positioning and computer network technology 1. Project reserve management project Reserve management is the core of the entire system. The construction of the system will be managed and monitored by years and stages around project information.

[0021] In addition to project information entry and project information management, project repository management also includes project repository query, project information change, image progress management, image progress query, project information and image progress related report generation. Specifically, it must include:

[0022] 1) Project information entry

[0023] The function of project information input is to manage the newly de...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a fixed asset project management system based on a geographic information system. The fixed asset project management system is characterized by including project repository management which is the core of the whole system; system building: management and monitoring are performed according to years and stages surrounding project information; system comprehensive setting and management performed by system managers by aid of the system management function; user authorization management for meeting safe system operation requirements; and different use authorization setting according to different users by aid of the user management, role management and authorization management functions needed to be provided by the system, traditional functional menu authorization control and authorization management of users for projects, and accordingly related personnel only can inquire and manage the projects which are taken charge by their departments. The fixed asset project management system is used for fixed asset project progress filling and supervising, project information inquiring and maintaining, report form guiding out and fixed asset supervising.

Description

technical field [0001] The invention relates to a fixed asset project management system based on a geographic information system. Background technique [0002] For large enterprises and relevant departments of government fixed asset investment management, management is difficult due to the large number of fixed asset projects and the large amount of investment distributed in various enterprises and departments every year. The efficiency of reporting and review is not high, and the tracking and feedback of the project are not timely; the amount of project information is huge, and it is extremely inconvenient to file and consult; the business of each department overlaps, and project information cannot be fully shared, which often leads to Inconsistent information; lack of effective management means for project owners, resulting in lack of timeliness and authenticity of project progress information; lack of close contact with other government departments, inconvenient to coordi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06
Inventor 吴兰村
Owner 大连恒基电子技术有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products