Coordinated green wave control method for multi-line buses on trunk lines
A coordinated control, multi-line technology, applied in the direction of road vehicle traffic control system, traffic control system, instruments, etc., can solve the problem of turning vehicles that do not fully consider merging into and leaving the main line, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0079] The present invention will be further described below in conjunction with the accompanying drawings.
[0080] like figure 1 As shown, it is a green wave coordinated control method for multi-line buses, including the following steps:
[0081] Step 1: Setting of pre-signal bus priority control facilities (such as figure 2 shown)
[0082] Step 1.1: Layout of intersection approach roads under pre-signal conditions
[0083] First, along one of the directions of the trunk line, number the road sections between adjacent intersections sequentially, and record them as road section 1, road section 2, ..., road section i, ..., road section n, and arrange downstream intersections of each road section in sequence according to the direction of the bus line Pre-signal bus priority facility at the exit:
[0084] 1.1.1) If all the bus lines on road section i go straight at the downstream intersection, then set up a bus-only entrance lane at the downstream intersection of road secti...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com