Power system planning scheme flexibility assessment method based on probability risk assessment
A technology for probabilistic risk assessment and flexibility assessment, applied in the fields of instruments, data processing applications, resources, etc., and can solve problems such as the lack of generally recognized assessment methods and indicators
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2013-09-18
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention is a method for evaluating the flexibility of power system planning schemes based on probabilistic risk assessment, which belongs to the innovative technology of the method for evaluating the flexibility of power system planning schemes based on probabilistic risk assessment. Background technique
[0002] Power system planning evaluation is a complex system engineering, which must fully consider many factors such as the relationship between power supply and demand, the coordination of power grid construction and economic development, and the uncertainty of power grid development. Therefore, it is impossible to evaluate the planning scheme from a single angle, but various factors should be considered comprehensively to form a comprehensive comprehensive evaluation standard. The traditional power system planning evaluation is mainly carried out from two aspects of reliability and economy.
[0003] Reliability assessment is mainly aimed at ...
Examples
Embodiment Construction
[0031] The risk assessment-based power system planning assessment method proposed in the present invention is used in the flexibility assessment of power system planning schemes. In this method, the probabilistic risk index is used as the flexibility evaluation index of the power system planning scheme, through which the ability of each planning scheme to deal with various uncertain factors can be evaluated and compared. Flexibility evaluation is an important criterion to measure whether a planning scheme can adapt to various uncertain factors faced by the future power system development. However, there is no generally accepted evaluation method and index for the flexibility evaluation of power system planning schemes. In order to solve this problem, the risk assessment theory is introduced into the power system planning scheme, the probability characteristics of several types of uncertain factors faced by the planning scheme are predicted through historical data, and the impac...