Power distribution network contact construction sequence optimization method based on maximum power supply capability

A technology of maximum power supply capacity and optimization method, applied in the field of distribution network, can solve problems such as reducing the utilization rate of power grid assets, TSC parameters cannot reach the maximum value, and research on the order of connection construction

Active Publication Date: 2013-11-20
TIANJIN UNIV
View PDF5 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The above studies have guided the optimization of distribution network linkages from the perspective of TSC, but have not studied the sequence of linkage construction, and cannot keep the TSC parameters at the maximum value of each phase of construction, resulting in a large load capacity in stages. Weak; and after the grid construction is completed, the overall TSC parameters cannot reach the maximum value, thereby reducing the asset utilization of the grid

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power distribution network contact construction sequence optimization method based on maximum power supply capability
  • Power distribution network contact construction sequence optimization method based on maximum power supply capability
  • Power distribution network contact construction sequence optimization method based on maximum power supply capability

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0059] In order to make the object, technical solution and advantages of the present invention clearer, the implementation manner of the present invention will be further described in detail below in conjunction with the accompanying drawings.

[0060] In order to achieve the maximum value of TSC parameters in each stage and the overall process and improve the utilization rate of power grid assets, the embodiment of the present invention provides a method for optimizing the order of distribution network connection construction based on the maximum power supply capacity, see figure 1 and Figure 4 , the method proposed in the present invention can determine the construction order of the tie lines, so that the TSC at any stage maintains a phased maximum value, and the TSC parameters of the overall construction process maintain the maximum value, as described below for details:

[0061] 101: Define each variable required in the contact optimization process;

[0062] Definition 1...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a power distribution network contact construction sequence optimization method based on the maximum power supply capability. The power distribution network contact construction sequence optimization method based on the maximum power supply capability comprises the following steps of: according to each variable and an optimal feeder line contact construction sequence required in a contact optimization process, establishing an optimal feeder line contact construction sequence model; according to the expandable power supply capability, calculating optimal connecting line scale; calculating the sum of outside-of-station contact positions and the contact datum degree; and searching a maximum weighting contact balance degree to obtain an optimal feeder line contact sequence. According to the method, the connecting line scale is reduced, the contact efficiency is improved, the contact construction fund is saved, the contact distribution is more balanced, the use ratio of the connecting line capacity is higher, and instation transfer load is more, thereby more conforming to a dispatching principle. A TSC parameter in the method can achieve the maximum value in each stage and the whole process, the use ratio of the power grid asset is improved, the optimal feeder line contact construction sequence capable of performing the maximum power supply capability of the power distribution network in each planning stage can be given, and the defect that a main-transformer planning contact number exceeds a main-transformer maximum line outgoing number is overcome.

Description

technical field [0001] The invention relates to the field of distribution networks, in particular to a method for optimizing the sequence of distribution network connection construction based on maximum power supply capacity. Background technique [0002] The distribution network is the part closest to the user in the power network, and its scientific optimization can ensure the rationality of the power grid transformation, the safety and economy of the power grid operation, and improve the power supply quality of the distribution network. The distribution network can be divided into substation optimization and grid optimization from the optimization object, and can be divided into single-stage optimization and multi-stage optimization from the optimization model. The connection is an important structure of the distribution grid, and the connection construction sequence is essentially a phased construction of the connection. [0003] The power supply capacity of distributio...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/00
Inventor 肖峻王成山祖国强
Owner TIANJIN UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products