Method and system for automatically generating WBS (Work Breakdown Structure) node basing on BIM (Building Information Modeling)
An automatic generation and node technology, applied in the computer field, can solve problems such as heavy workload, frequent occurrence, and heavy workload of staff, and achieve the effect of improving work efficiency and reducing workload
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] Figure 1a It is a flow chart of the method for automatically generating WBS nodes based on the BIM model described in Embodiment 1 of the present invention, as shown in Figure 1a As shown, the method includes:
[0043] 110: Define tasks in terms of construction works.
[0044] Specifically, the specific tasks in the building construction process of the task, such as building walls, supporting formwork, pouring concrete, etc.
[0045] 120: Associate the corresponding bill of quantities content for the task according to all the bill of quantities contents included in the construction project.
[0046] Specifically, the content of the bill of quantities is also called a checklist. In the entire construction project, one task may be associated with multiple bills of quantities. For example, when the task is to build a wall, its associated bill of quantities May include: building straight walls, building curved walls, etc. In addition, when the process of a bill of quant...
Embodiment 2
[0067] This embodiment is described based on Embodiment 1, as figure 2 As shown, the difference between the method described in this embodiment and the method described in embodiment 1 is only:
[0068] The step 130 also includes: according to the BIM model, determining the model range contained in the pipeline section, and the model scope corresponds to the component graphics in the bill of quantities contained in the pipeline section (corresponding to figure 2 in step 130').
[0069] After step 160, the method may also include:
[0070] 210: Associating the component graphic elements in the content of the bill of quantities corresponding to the WBS node to the WBS node.
[0071] Specifically, the BIM model also includes component graphics corresponding to the content of each bill of quantities. After the content of the bill of quantities corresponding to the WBS node is determined, through this step, the corresponding component graphics are automatically associated with ...
Embodiment 3
[0076] image 3 It is a schematic diagram of the system module structure for automatically generating WBS nodes based on the BIM model described in Embodiment 3 of the present invention, as shown in image 3 As shown, the system 300 includes: a task definition unit 310 , a task association unit 320 , a pipeline segment unit 330 , a node establishment unit 340 , a corresponding unit 350 and a calculation unit 360 .
[0077] The task definition unit 310 is configured to define tasks according to construction projects.
[0078] The task associating unit 320 is configured to associate the corresponding bill of quantities content with the task according to all the bill of quantities contents included in the construction project.
[0079] The flow section unit 330 is used to divide the flow section of the construction project according to the BIM model, and determine the content of the bill of quantities included in the flow section, and the content of the bill of quantities corres...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com