Method for determining best time to construct secondary lining of soft broken surrounding rock tunnel
A technology of crushing surrounding rock and judging method, applied in tunnel lining, tunnel, wellbore lining, etc., can solve problems such as difficult operation and complexity, and achieve the effect of comprehensive judgment method, comprehensive consideration and strong operability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is carried out on the premise of the technical solution of the present invention, and detailed implementation and specific operation process are given, but the protection scope of the present invention is not limited to the following embodiments.
[0035] like figure 1 As shown, a method for judging the best timing of the secondary lining construction of tunnels with weak and broken surrounding rock, through the on-site monitoring and measurement of the settlement of the vault and the deformation convergence of the side wall of the surrounding rock-primary support system, using the surrounding rock-primary support system Based on the measured deformation data, the rate ratio method of the deformation of the surrounding rock-primary support system and the five-level rate ratio method considering whether the support is conservativ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com