A high-strength walkway slab for temporary roads
A technology for temporary roads and walkway boards, applied to roads, roads, single-axis trolleys, etc., can solve the problems of serious waste, small road load capacity, and easy damage, and achieve the effects of not easy to fall off, wide use range, and saving social resources
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] Such as Picture 1-1 , Figure 1-2 , image 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 , Figure 8-1 , Figure 8-2 , Figure 8-3 The present invention shows a temporary road high-strength walkway slab and a special trolley, including a high-strength walkway slab at the construction site and a special trolley for carrying the temporary walkway slab.
[0032] Among them, as shown in Figure 1- Figure 4 The shown high-strength walkway slab of the present invention adopts high-strength concrete 8, and adds 14 150mm double-layer two-way overall reinforcement 5, the length is determined according to the size of the required walkway slab, and the corners of the walkway slab are wrapped with angle steel 1, which can effectively prevent damage during transportation and use. In addition to the main specifications of the length and width of the walkway slab, the walkway slab of the required size can be flexibly manufactured according to the actual situation on sit...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com