Network dynamic service monitoring method and device
A network business and business technology, applied in data exchange networks, commerce, instruments, etc., can solve the problems of inability to further judge the severity of abnormal events, inability to distinguish, and increase the workload of alarms.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0087] refer to figure 1 , which shows a structure diagram of a network dynamic service monitoring method provided in Embodiment 1 of the present application. The architecture diagram reflects the basic idea of the subsequent embodiments. The architecture diagram also reflects the method of dynamic business monitoring using the success rate and failure rate respectively. The two methods have the same essence, but the selection direction is different, which leads to some parameters and specific calculation formulas selected by the two methods. different.
[0088] Such as figure 1 The method shown uses the success rate to judge the alarm. This method first calculates the business success rate in the monitored time period. After calculating the business success rate in the monitored time period, it is compared with the first alarm threshold calculated according to the previous business data. If the business success rate is less than or equal to the first alarm threshold, it...
Embodiment 2
[0092] refer to Figure 2-Figure 4 , which shows a method for network dynamic service monitoring according to Embodiment 2 of the present application. The method includes figure 2 , Figure 4 Two flowcharts; where figure 2 Showing the steps of preliminary judgment of abnormal events for the monitored time period, Figure 4 It shows how to make a further secondary judgment on the abnormal event judged initially, and select the alarm mode. The second embodiment is a detailed solution to the network dynamic service monitoring method provided in the first embodiment.
[0093] The implementation steps of a preferred technical solution adopted in this embodiment are as follows:
[0094] Step S101: Calculate the business success rate Rate_Now_S or the business failure rate Rate_Now_F within the monitored time period.
[0095] In this embodiment, the time period of 10 minutes before the moment of obtaining business data is selected as the monitored time period; the business da...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com