Inlet wire emergency power supply automatic switch-in control method and system
A technology of backup power supply and automatic input, applied in emergency power supply arrangement, electrical components, circuit devices, etc., can solve the problems of power grid and line switch impact, affecting the normal operation of substations, and affecting the safety of power grids and equipment.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] The invention provides a method for automatic input control of incoming line backup power, which is used for a single-bus subsection wiring circuit in a substation. The bus-tie switch that controls the connection and disconnection between the two sections of busbars, the automatic input device for incoming line backup power, the first main transformer connected to the first busbar and the second main transformer connected to the second busbar; see figure 2 as shown, figure 2 It is a flow chart of the process of a method for automatic input control of incoming line backup power provided by the present invention; the method includes:
[0039] Step s101: After the first main transformer or the second main transformer performs protection action, judge whether the bus tie switch is disconnected, if yes, go to step s102; otherwise, go to step s103;
[0040] Step s102: Control the action of the automatic input device for the incoming backup power supply, and the backup powe...
Embodiment 2
[0044] The present invention also provides another automatic input control method for incoming line backup power, see image 3 as shown, image 3 A flow chart of the process of another incoming standby power supply automatic input control method provided by the present invention; the method includes:
[0045] Step s201: judge whether the protection action of the first main transformer or the second main transformer is carried out, if yes, go to step s202; otherwise, go to step s203.
[0046] Step s202: judge whether the bus tie switch is disconnected, if yes, go to step s203; otherwise, go to step s204;
[0047] Step s203: Control the action of the automatic input device for the incoming backup power supply, and the backup power supply starts to supply power;
[0048] Step s204: Controlling that the automatic input device of the incoming backup power supply does not operate, and the backup power supply is not put into use.
[0049] Wherein, the process of judging whether th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com