Public bicycle peak time scheduling method based on multilevel partition
A technology of public bicycles and dispatching methods, applied in genetic models, genetic rules, instruments, etc., can solve problems such as inability to guarantee the optimal route, dispatch efficiency and timeliness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0097] The present invention will be further described below in conjunction with specific examples.
[0098] The public bicycle peak-hour scheduling method based on multi-level zoning described in the present invention establishes a multi-level zoning scheduling method with the goal of ensuring timely and effective scheduling by analyzing and summarizing the tidal demand difference and time-space distribution characteristics of public bicycles. It is generally divided into three layers: dispatching area, residential area, and rental point. Several rental points form a residential area, and the dispatching area contains several residential areas. Vehicles operate in the dispatching area during peak hours, and the dispatching between cells is finally implemented at the leasing point. The scheduling method at the cell level is to establish an inter-cell scheduling model with a time window that takes the overall demand of the cell as input to determine the inter-cell scheduling sch...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com