A prefabricated large block assembled concrete drainage pipe base and its construction method

A technology of prefabricated concrete and drainage pipes, which is applied in infrastructure engineering, construction, etc., can solve the problems of affecting traffic, the bottom of the groove is easily soaked in water, and the bottom of the groove is easy to be frozen, so as to ensure social traffic and personal safety. And the effect of novel and simple structure, undisturbed soil and less environmental disturbance
CN105926665BActive Publication Date: 2018-07-24CHINA CONSTR MUNICIPAL ENG +1

Patent Information

Authority / Receiving Office
CN ยท China
Patent Type
Patents(China)
Current Assignee / Owner
CHINA CONSTR MUNICIPAL ENG
Publication Date
2018-07-24

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention belongs to a large block assembled type prefabricated concrete drainage pipeline base and a construction method thereof. The method includes the steps of prefabricating the concrete drainage pipeline base, carrying out base center line paying-off on the bottom of a constructed pipeline trench, building the concrete drainage pipeline base in a spliced mode, placing pipelines downwards and installing the pipelines, pouring pipe protection concrete into the assembled concrete drainage pipeline base with flanges serving as formworks on the two sides, and the like. The prefabricated concrete drainage pipeline base comprises a board body and a lifting hook. An outer convex edge protruding out of the front end face of the board body is arranged on the lower portion of the front end of the board body. An inner concave edge sinking into the rear end face of the board body is formed in the lower portion of the rear end of the board body. Steel bar lantern rings for clamping steel bars are arranged on the inner edges of the flanges on the two sides of the board body at intervals. The large block assembled type prefabricated concrete drainage pipeline base and the construction method thereof have the advantages that the method and the structure are novel and simple, the trench bottom construction procedures are reduced, working efficiency is high, construction cost is low, safety is high, construction speed is high, disturbance on undisturbed soil and the environment is small, energy saving and environment friendliness are achieved, and the linked pipe protection effect is good.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to a prefabricated large block assembled concrete drainage pipe base and a construction method thereof. Background technique

[0002] At present, the bases of domestic municipal pipe network concrete drainage pipes and various underground pipes are basically constructed with cast-in-place concrete bases. , formwork, pouring concrete base, downpipe, safety pipe, pouring concrete for protective pipe, backfilling, compaction. Obviously, the traditional construction method has many working procedures at the bottom of the trench and takes a long time, which will not only affect the traffic, but also cause great disturbance to the undisturbed soil at the bottom of the trench. At the same time, the trench is exposed for a long time, and the bottom of the trench is easily disturbed by the surrounding environment. In the northern region, the temperature is low, and the bottom of the trench is easy to be frozen; very high. If the undistu...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More