A construction method for integral hoisting and installation of prefabricated temporary steel pipe support
A steel pipe support and overall hoisting technology, which is applied in the erection/assembly of bridges, bridges, buildings, etc., can solve the problems of many hidden dangers in high-altitude operation, many input resources and facilities, and large amount of welding works, so as to reduce the risk of high-altitude operation, The effect of improving construction work efficiency and improving welding quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] The present invention will be further described below in conjunction with specific embodiments.
[0024] like figure 1 As shown, the overall hoisting construction method of the prefabricated steel pipe support shown in the present invention includes: steel pipe support design, support prefabricated site leveling, hardening, drawing steel pipes, flat joints, scissors braces, upper and lower steel plates and other semi-finished structures. Processing, horizontal scissor brace welding connection, erecting steel pipe support prefabricated tire frame, steel pipe column positioning welding, steel pipe support assembly, steel pipe support installation foundation construction, prefabricated steel pipe support one-time hoisting in place, pile top beam installation, according to the target structure The leveling device on the top of the beam is installed at the level of the bottom plate.
[0025] Specifically, the design of the steel pipe support is designed according to the par...