Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

127 results about "Cross slope" patented technology

Cross slope, cross fall or camber is a geometric feature of pavement surfaces: the transverse slope with respect to the horizon. It is a very important safety factor. Cross slope is provided to provide a drainage gradient so that water will run off the surface to a drainage system such as a street gutter or ditch. Inadequate cross slope will contribute to aquaplaning. On straight sections of normal two-lane roads, the pavement cross section is usually highest in the center and drains to both sides.

Steel wedge slope adjusting device in bent cap supporting system

The utility model discloses a steel wedge slope adjusting device in a capping beam supporting system, which comprises a lower wedge block and an upper wedge block, the lower wedge block and the upper wedge block are both right trapezoid blocks, the inclined plane of the upper wedge block and the inclined plane of the lower wedge block are attached to each other, a screw rod is inserted among a first notch, a second notch, a third notch and a fourth notch, and the screw rod is connected with the lower wedge block. The outer side of the screw rod is connected with two nuts in a threaded mode, and the two nuts are located on the left side of the upper wedge block and the right side of the lower wedge block respectively. According to the steel wedge slope adjusting device in the bent cap supporting system, the steel wedge device for fine adjustment of the elevation and the cross slope is arranged in the structure supporting system, and the elevation of the device is adjusted up and down by screwing a screw rod in the device and extruding and releasing a wedge-shaped block. Corresponding cross slope bolt holes are selected synchronously according to designed cross slope parameter values, long and short bolts penetrate into the holes, the top face of the device rotates around a rotating shaft, and cross slope matching of the device is achieved.
Owner:CCCC FOURTH HIGHWAY ENG CO LTD +1

Rotary type gravity center regulation and control track platform for hilly and mountainous areas

The invention relates to the technical field of agricultural machinery, in particular to a rotary gravity center regulating crawler platform for hills and mountains, which sequentially comprises a crawler chassis assembly, a gravity center regulating assembly and a functional module mounting platform from bottom to top, the gravity center adjusting layer is installed on the chassis rack and located in the space between the crawler belts on the two sides, the gravity center adjusting layer is composed of a supporting base, a slewing bearing module, a linear lead screw module, a battery balancing weight and a machine shell, and the balancing weight is preferably a power battery pack; and the functional module mounting platform is fixed at the upper end of the gravity center adjusting assembly. By adjusting the angular and radial distribution of the counterweights, the center-of-gravity position of the whole machine under the working conditions of cross slopes, longitudinal slopes and obstacle crossing is changed, the stability and driving safety of the crawler belt platform in complex terrains of hills and mountains are improved, and the crawler belt platform can be provided with different functional modules according to operation objects. The method is suitable for various hilly and mountainous region agriculture and engineering application scenes.
Owner:GUANGXI UNIV

Multifunctional intelligent adjusting type beam manufacturing pedestal construction method and system

The invention discloses a multifunctional intelligent adjusting type beam manufacturing pedestal construction method and system and a medium, and the method comprises the following steps: 1) collecting morphological parameters of a plurality of prefabricated beam models, the morphological parameters including the length, width, longitudinal slope and cross slope of a prefabricated beam, and carrying out statistical analysis through an intelligent analysis system; (2) a beam manufacturing pedestal conforming to the model and size range of a plurality of precast beams is manufactured; (3) morphological parameters of the precast beam to be machined are collected, and the collected morphological parameters are analyzed through the intelligent analysis system and transmitted to the pedestal control system; and (4) the pedestal control system adjusts the manufacturing parameters of the beam manufacturing pedestal according to the received morphological parameter data. By the adoption of the beam manufacturing pedestal structure capable of adjusting the length, the pedestal length can be automatically set according to the design parameters of the precast beams, meanwhile, the pedestal length is automatically adjusted according to the production plan of the next step, precast beams of various models can be produced through one beam manufacturing pedestal, the pedestal does not need to be customized separately, the land area of a beam manufacturing field is greatly reduced, and the production efficiency is improved. And the production efficiency is improved.
Owner:SINOHYDRO BUREAU 5

Road construction paving quality detection method, system equipment and medium

The invention discloses a road construction paving quality detection method, system equipment and a medium, and relates to the technical field of road construction quality detection.The method comprises the steps that laser point cloud data, infrared thermal imaging data and vibration frequency spectrum data of a road paving layer are collected through a multi-mode sensor set carried by a vehicle-mounted mobile platform, and the laser point cloud data, the infrared thermal imaging data and the vibration frequency spectrum data are obtained; performing data preprocessing to obtain a standardized engineering data set; calculating the pavement flatness, the transverse gradient variation coefficient and the tectonic depth variation of the to-be-detected area to obtain geometrical characteristic parameters; identifying a void area of the road pavement layer, and calculating a thermal anomaly parameter to obtain a thermodynamic parameter; establishing a vibration response feature library; determining a weight coefficient by adopting an analytic hierarchy process based on the geometrical characteristic parameters, the thermodynamic parameters and the vibration response characteristic library; in the target quality comprehensive evaluation model, determining a quality index of the to-be-detected area, and generating a pavement quality detection result in combination with a quality grading standard; according to the invention, the detection accuracy of road construction pavement quality detection is improved.
Owner:GUANGDONG OVERSEAS CONSTR SUPERVISION COLTD

Control model acquisition method and system of 3D paving automatic leveling model and monitor installation position optimization method based on asphalt mixture material characteristics, controller and control method

A control model acquisition method and system, a controller and a control method of a 3D paving automatic leveling model and monitor installation position optimization method based on asphalt mixture material characteristics, comprising the steps of 100, establishing a screed dynamical model, 200, establishing a 3D paving automatic control system model, 300, establishing a monitoring signal receiver installation position optimization method, and 400, establishing a monitoring signal receiver installation position optimization method. According to the method, the screed dynamical model is established, the interaction between the paving material and the screed is fully considered, the screed dynamical response influence factors are clear, then the 3D paving automatic leveling model is established to control the pavement flatness and the cross slope, and finally a monitor mounting position optimization method is put forward to improve the paving quality. According to the technical scheme, technical support is provided for development and reliable operation of asphalt pavement high-quality paving construction equipment.
Owner:HARBIN INST OF TECH +2

Prefabricated T-beam formwork suitable for large transverse and longitudinal slopes and small radius and construction method

PendingCN120170873AMouldsChange positionsRebar
The invention discloses a prefabricated T-beam formwork suitable for large transverse and longitudinal slopes and small radius and a construction method. A road small radius and same span beam length change is large, and the small radius is accompanied by a large transverse slope and a large longitudinal slope. The T-beam bottom formwork is provided with a longitudinal slope adjuster capable of changing positions at will; length adjusting section templates are designed on the beam body middle uniform-section section and the beam end uniform-section section; the reasonable positions of the side mold and the wing mold are divided and hinged, and a screw rod is arranged at the end part of a wing plate, so that free and flexible adjustment of a large cross slope of the wing plate is realized; the bottom die and the end plate of the beam middle diaphragm plate are arranged in the side die and are of a cross slope adjustable structure; beam end diaphragm plates are cast in place on an axle after a beam body is hoisted in place, only oblique crossing steel bars are reserved on the end diaphragm plates, and it is guaranteed that the central axes of the beam end diaphragm plates of all beams of the same span are collinear; the beam end formwork is of a side wing end wrapping type and is divided into a lower fixed formwork body and an upper movable formwork body, the end face of the lower fixed formwork body is perpendicular to the axis of a beam body, the tensioning requirement is met, and the upper movable formwork body can achieve trapezoid design and cross slope adjustment of the beam body. The template is easy to demould, can realize all alignment of diaphragm plates at corresponding positions of same-span beam pieces, and has good adaptability to small radiuses.
Owner:CHINA RAILWAY 12TH BUREAU GRP CO LTD +1

Adjustable bottom cross beam assembly of multi-curvature camber beam extradosed cable-stayed bridge hanging basket

The utility model discloses an adjustable bottom cross beam assembly of a multi-curvature camber beam extradosed cable-stayed bridge hanging basket. Relates to the technical field of cable-stayed bridge hanging basket construction, and comprises a bottom cross beam which is divided into two sections from a cross slope change point, and a gap is arranged between the two sections of bottom cross beam; the two connecting pieces are arranged in the gap, each connecting piece comprises a connecting plate and a pin shaft hole plate, the connecting plates are connected with the bottom cross beam, the pin shaft hole plates are vertically arranged on the connecting plates, pin shaft holes are formed in the pin shaft hole plates, the pin shaft hole plates on the two connecting pieces make contact with each other, and the two pin shaft hole plates are hinged through a pin shaft. According to the utility model, the two sections of bottom cross beams are respectively provided with the connecting pieces, and the connecting pieces on the two sections of bottom cross beams are hinged through the pin shaft, so that the left bottom cross beam can be adjusted up and down, the elevation of the bottom die and the accuracy of the cross slope of the beam bottom are ensured, and compared with the conventional method, the operation is simple, the consumed time is shortened, and the cost is saved.
Owner:CHINA CONSTR FIFTH ENG DIV CORP LTD

Lateral control method and apparatus for vehicle

The invention relates to a transverse control method of a vehicle. The method comprises the steps that the transverse gradient of a road surface is received; determining a front wheel steering angle of the vehicle based on the transverse slope of the road surface; and transverse control is conducted on the vehicle through the front wheel steering angle. The application also relates to a lateral control device of a vehicle, a computer storage medium, a computer program product and an advanced driving assistance system (ADAS).
Owner:ROBERT BOSCH GMBH

Method for monitoring differential settlement of highway subgrade

A highway subgrade differential settlement monitoring method belongs to the field of road construction, and comprises the following steps: S1, in a highway subgrade construction and reconstruction stage, according to a preset gradient layout scheme, burying distributed fiber grating sensors and MEMS acceleration and tilt angle sensors at subgrade key nodes, meanwhile, a built-in environment sensor and a reference calibration node are arranged, the environment sensor is used for collecting temperature and humidity environment parameters in real time, and the reference calibration node provides a stable reference to realize sensor self-calibration and environment compensation; according to the scheme, the distributed fiber bragg gratings and the MEMS sensors are arranged at the key nodes of the roadbed, the unmanned aerial vehicle flight technology is combined, continuous, automatic and real-time monitoring of roadbed settlement, flatness, cross slope and center line deviation is achieved, and the problems that a traditional monitoring method is poor in real-time performance and discontinuous in data are fundamentally solved.
Owner:GUANGZHOU NO 2 MUNICIPAL ENG CO LTD

Cross-country terrain prop

The utility model discloses a cross-country terrain prop which comprises a Z-shaped crossing slope, and the Z-shaped crossing slope comprises a first slope body, a second slope body and an arched bridge. The first end of the first slope body is a driving-in end, the first side of the second end of the first slope body is connected with the first end of the arched bridge, the second end of the arched bridge is connected with the first side of the first end of the second slope body, and the second end of the second slope body is a driving-out end. The first side of the first slope body is higher than the second side of the first slope body. The first side of the second slope body is higher than the second side of the second slope body. Compared with the prior art, the cross-country terrain prop provided by the utility model can simulate suspension of a single-side wheel and driving conditions of an SUV fork lock and a single wheel in an actual cross-country process.
Owner:SHANGHAI SHAN XIN LOGISTICS CO LTD

Method and device for differential height modification of the surface of the traffic area

The method of differential height modification of the surface of the traffic area, in which the surface of the traffic area before modification is measured and a digital model of the surface of the traffic area before modification is calculated. The design of the target surface of traffic area after modification is determined. The differential model of the height adjustments is calculated from the differences in the heights of these surfaces. During modification, the X, Y position of the right and left working part of the working tool of the construction machine is then determined, which creates a new surface by modifying, and the appropriate target height adjustment Ft (X, Y) from the unmodified surface of the traffic area is determined from the differential model of the height adjustments. This information is transmitted to the control computer of the construction machine, which makes the necessary adjustments to the construction machine to achieve the desired height and cross slope of the modification. To determine the X, Y position of the right and left working part of the working tool, data from a total station arranged stationary outside the construction machine is used and then the height of the adjustments Ft (X, Y) is determined from the differential model of the height adjustments. A device for carrying out such a method is further described.
Owner:EXACT CONTROL SYST AS

Asphalt pavement rut depth image detection and cross section reconstruction method and system thereof

The invention relates to the technical field of road detection, and discloses an asphalt pavement rut depth image detection and cross section reconstruction method and system, and the method comprises the steps: fusing vehicle-mounted laser, binocular images, mileage positioning and design cross slope data; a deep learning stereo matching network is adopted to densely reconstruct a road surface three-dimensional morphology point cloud; extracting a cross section curve and performing cross slope correction; calculating the depth, the area and the width of the rut by adopting a virtual ruler method; calibrating, correcting, feeding back and updating network parameters based on measured data; the system comprises a multi-source data fusion module, a deep learning stereo matching module, a cross section extraction module, a rut feature extraction module, a calibration correction module and a disease grading module, the measurement precision reaches plus or minus 1 mm, the detection speed reaches 80 kilometers per hour, and the accuracy rate reaches 95% or above.
Owner:安康市道路运输服务中心

A vehicle control method, device, equipment and medium on a cross slope road

The application discloses a vehicle control method and device on a transverse slope road, equipment and medium, relates to the field of advanced driving assistance, and comprises the following steps: acquiring the vehicle speed, yaw angular velocity and first lateral acceleration of a vehicle, determining the second lateral acceleration based on the vehicle speed and yaw angular velocity; high-order filtering the first lateral acceleration and the second lateral acceleration respectively; determining the target acceleration based on the filtered first lateral acceleration and the filtered second lateral acceleration, and high-order filtering the target acceleration; determining the transverse slope compensation torque through the filtered target acceleration and a torque compensation coefficient, so as to control the vehicle. The vehicle speed, yaw angular velocity and first lateral acceleration and other information in the application are information that can be acquired in a low-cost manner, therefore, the application reduces the calculation cost of the transverse slope compensation torque, and through high-order filtering of the lateral acceleration and the target acceleration, the application improves the smoothness of the vehicle in a curve and reduces oscillation.
Owner:IMOTION AUTOMOTIVE TECH (SUZHOU) CO LTD

Method for calculating static overturning limit angle of bowing and twisting tractor

The invention provides a method for calculating a static overturning limit angle of a bowing and twisting tractor, and aims to accurately evaluate the static stability of the bowing and twisting tractor in a complex posture. The core of the method is to construct a three-dimensional virtual simulation model of bowing and twisting degrees of freedom, and to set a target attitude of any combination. The gradient angle of the tractor reaching the overturning critical state is determined by simulating the iteration increasing process of a cross slope or a longitudinal slope and combining real-time geometric judgment on the position relation between front, rear and whole vehicle mass center projections and corresponding supporting polygons according to specific cross slope and longitudinal slope instability triggering conditions. The method provided by the invention can quantitatively calculate the static stability limit of the tractor in a complex attitude.
Owner:CHINA AGRI UNIV

Tunnel construction method for crossing slope body of abrupt slope section

The invention relates to the technical field of tunnels, and provides a tunnel construction method for crossing an abrupt slope section landslide mass, which comprises the following steps of: constructing an anti-slide pile assembly on one side, close to a ground line, of the abrupt slope section landslide mass on a tunnel line; a first side pilot tunnel, close to one side of the slide-resistant pile, of the tunnel main hole is excavated, and then a first primary support and a lateral strengthening structure corresponding to the first side pilot tunnel are constructed; a second side pilot tunnel on the side, away from the slide-resistant pile, of the tunnel main hole is excavated, and then a second primary support corresponding to the second side pilot tunnel is constructed; a middle pilot tunnel located between the first side pilot tunnel and the second side pilot tunnel is excavated from top to bottom, and then a third primary support corresponding to the middle pilot tunnel is constructed; constructing a secondary lining of the tunnel main hole; according to the construction method, the primary support and the slide-resistant piles are connected, cooperative stress among the primary support, the secondary lining and the slide-resistant piles is constructed, the safety of construction and operation of the slope body tunnel at the abrupt slope section can be improved, and the risk of tunnel diseases caused by the slope body is effectively reduced.
Owner:HUNAN PROVINCIAL COMM PLANNING SURVEY & DESIGN INST CO LTD

Composite intercepting and draining ditch

The utility model provides a composite type water intercepting and draining ditch which comprises a plurality of water intercepting openings which are sequentially arranged in the direction perpendicular to a cross slope of a road, and each water intercepting opening is obliquely arranged relative to the direction of the cross slope. The intercepting ditches are respectively positioned below the intercepting ports and are used for collecting flowing water from the intercepting ports; and the drainage ditch adopts a blind ditch, is arranged along the direction of the cross slope and is used for collecting the flowing water from the intercepting ditch and discharging the flowing water to the roadside ditch, so that the combination of the open ditch and the blind ditch is realized, and the technical problems of high possibility of vehicle jumping, high construction difficulty, incompact periphery and high possibility of sedimentation in the related technology are solved.
Owner:BEIJING GENERAL MUNICIPAL ENG DESIGN & RES INST

Railway vehicle sand spraying and cleaning control system and control method thereof

The invention belongs to the technical field of vehicle sand spraying and cleaning control, and relates to a railway vehicle sand spraying and cleaning control system and a control method thereof. According to the method, whether a sanding signal and an ice surface distribution characteristic label are output or not is dynamically judged through clustering analysis based on an ice surface image of a front track section and a track cross slope angle; the sanding spraying angle is dynamically set by fusing the vehicle speed, the rail cross slope angle and the ice surface characteristics, the target sanding flow is set according to the air source pressure, and the sanding duration is determined; monitoring the deviation between the actual sanding flow and the target flow in real time, and triggering the compensation action when the deviation exceeds the limit; monitoring the pressure difference change rate of the nozzle during the sand spraying execution period and after the sand spraying is finished, and executing sand cleaning operation if the sand spraying deviates from the normal trend. The problems that an existing sanding system is inaccurate in control on an icing track, low in sanding efficiency and prone to blockage of a nozzle are effectively solved, and the effects of improving sanding accuracy and automation level, enhancing friction force between wheels and the track, guaranteeing driving safety and reducing maintenance cost are achieved.
Owner:HUATIE WABTEC FAIVELEY (QINGDAO) TRANSPORT EQUIP CO LTD

Solid waste ecological concrete slope protection structure

A solid waste ecological concrete slope protection structure belongs to the technical field of slope ecological protection and comprises a slope, and a cross slope and a drainage channel are arranged above and below the slope respectively. A plurality of fence units, a first wire mesh and a second wire mesh are arranged on the slope surface of the slope, and the fence units define a solid waste filling groove on the slope surface of the slope; the second iron gauze and the first iron gauze are laid on the top face and the bottom face of the fence unit correspondingly, and the second iron gauze and the first iron gauze are connected with the fence unit through anti-disengaging nails correspondingly. A solid waste filling layer is arranged in the solid waste filling groove between the first iron gauze and the second iron gauze; a planting soil layer is laid on the top surface of the second iron gauze, and a grass seed mixture is arranged in the planting soil layer; fixing piles are further evenly distributed in the solid waste filling groove. The two layers of iron gauze restrain the solid waste filling layer, the solid waste filling grooves divide the surface area of the slope, the structure stability of the solid waste filling layer is improved through cooperation with the fixing piles, and supporting is provided for the planting soil layer.
Owner:UNIV OF JINAN

Crawler bulldozer descending operation method

The invention provides a segment descending operation method of a crawler bulldozer, which comprises the following steps of: performing topographic survey on an operation slope surface, and planning an operation route of the crawler bulldozer according to a topographic survey result, namely dividing a plurality of postponing platforms in a direction from a slope bottom to a slope top, the gradient of a cross slope between every two adjacent postponing platforms is smaller than or equal to 15 degrees, the gradient of a longitudinal slope between every two adjacent postponing platforms is smaller than or equal to 30 degrees, according to an operation planning route, the gravity center position of the crawler dozer is adjusted and checked, safety protection measures are ensured to be in place, a dynamic monitoring system is installed on the crawler dozer, and the operation of the crawler dozer is completed. And the stability of the crawler bulldozer on the slope is monitored in real time. The section descending operation method of the crawler bulldozer has the advantages of high operation efficiency and high safety.
Owner:BEIFANG WEIJIAMAO COAL POWER CO LTD

Prefabricating platform and prefabricating method for anti-collision wall of large-overhang-wing box girder

The invention discloses a prefabricating platform and prefabricating method for an anti-collision wall of a large-overhang-wing box girder, which is characterized in that the box girder is fixed on a cross slope support and an anti-sliding support, one end of the box girder is fixed on a supporting upright post, and the other end of the box girder is connected with a box girder pedestal through a pre-stress component, so that the anti-collision wall of the large-overhang-wing box girder is prefabricated under the condition that the cross slope gradient of the box girder is kept; the box girder is obliquely pulled through the prestress assembly, the box girder is prevented from overturning and rollover due to the fact that the weight of concrete and an anti-collision wall formwork is too heavy in the anti-collision wall pouring process, meanwhile, the accuracy of the axis of the anti-collision wall can be guaranteed, and then the building quality of the whole prefabricated box girder is guaranteed.
Owner:SHANGHAI CONSTR BUILDING MATERIALS TECH GRP CO LTD

Continuous drainage ditch on edge of bridge floor

The utility model discloses a bridge floor edge continuous drainage ditch which is arranged on the low side of a road surface drainage cross slope and comprises a plurality of transverse drainage pipes which are arranged below an anti-collision guardrail base and are arranged at intervals in the length direction of the anti-collision guardrail base, and further comprises a plurality of drainage ditch bodies which are located outside flange plates respectively, are parallel to the flange plates and are integrally formed. The inner wall of the end of the drainage ditch body is concaved inwards to form a mounting groove, a plurality of screws are annularly embedded in the mounting groove at intervals, every two adjacent drainage ditch bodies are connected through a corrosion-resistant connecting structure, and each connecting structure comprises a rubber cushion plate, a water stop belt and an impermeable layer which are sequentially arranged from bottom to top. The two ends of the rubber base plate are fully laid and pasted in the two opposite installation grooves through waterproof adhesive glue respectively, a plurality of screws penetrate through the rubber base plate and the water stop belt and are connected with the gaskets and the nuts, the deformation expansion amount consistent with the deformation expansion amount of the bridge expansion joint is reserved in the rubber base plate and the water stop belt, and impermeable layers are arranged on the upper surface and the periphery of the water stop belt.
Owner:GUIZHOU TRANSPORTATION PLANNING SURVEY & DESIGN ACADEME

A method for calculating dynamic stability limit of a tractor with folded and twisted waist

PendingCN122508722ARolloverClassical mechanics
This invention proposes a method for calculating the dynamic stability limit of articulated tractors under cross slope conditions, aiming to accurately assess the lateral stability of articulated tractors under complex terrain and dynamic operating conditions. This method first obtains parameters such as the tractor's geometry, mass, and dynamic acceleration; then, a spatial attitude model is established based on the rear body, transforming the articulation and torsional axes in the local coordinate system of the rear body to the global space, and causing the front body to move relative to the spatial articulation and torsional axes; the spatial coordinates of the four wheel points, articulation points, and centers of mass are calculated, constructing a four-wheel horizontal projection support quadrilateral, and obtaining the dynamic equivalent projection points based on longitudinal and lateral accelerations; by determining the positional relationship of the projection points relative to the left and right rollover boundaries, the critical stability angle of the cross slope is determined. This invention can be used to assess the lateral rollover risk of articulated tractors under different articulation, torsional, terrain undulation, and acceleration / deceleration conditions.
Owner:CHINA AGRI UNIV

Bridge padstone prefabricated pedestal capable of conveniently adjusting cross slope

The utility model discloses a bridge padstone prefabricating pedestal convenient to adjust a cross slope, which comprises a pedestal body, a plurality of template groups used for prefabricating bridge padstones are arranged on the pedestal body, and a cross slope adjusting component is arranged below the pedestal body; supporting seats are arranged on the two sides of the bottom of the pedestal body, mounting holes are formed in the supporting seats on the two sides, positioning rod assemblies are inserted between the mounting holes on the two sides, and the positioning rod assemblies are arranged at the two ends of each supporting seat; according to the utility model, the cross slope adjustment is realized through the cross slope adjustment assembly, so that the cross slope adjustment of the pedestal body is realized; the positioning rod assembly can secondarily fix the prefabricated pedestal after the cross slope is adjusted, and it is guaranteed that the cross slope can be kept stable in the prefabrication process of the bridge padstone; the adjusting rods are controlled to move through stretching and retracting of the telescopic rods, so that the height of one end of the upper pedestal is changed, the adjusting range is larger and finer through the two sets of adjusting rods, and prefabrication tasks with different cross slope requirements can be better met.
Owner:5TH ENGINEERING LTD OF THE FIRST HIGHWAY ENGINEERING BUREAU CCCC +1

Thickness test method of highway asphalt pavement surface based on 3D holographic detection technology

The present invention discloses a method for testing the surface thickness of a highway asphalt pavement based on three-dimensional holographic detection technology. The method calculates the relative elevation at the full-section position of the pavement at the measuring point i through three-dimensional detection data; obtains the designed cross slope of the road section and the surface thickness control parameters at the corresponding measuring point i, and calculates the elevation of the top surface of the surface layer after the construction of the corresponding measuring point i is completed; calculates the thickness of the full-section surface layer after the construction is completed; and calculates the qualified number of measuring points m to obtain the qualified rate of the pavement surface layer thickness after the construction is completed. The method of the present application can provide reasonable control parameters for construction, belongs to a pre-control means, has a large application range, and is a simple, easy and objective test method.
Owner:GUANGDONG JIAOKE TECH R & D CO LTD +1

Oscillation circuit of automobile test field

The utility model discloses an automobile test field oscillation road which comprises a base layer and a surface layer, the top of the base layer is covered with the surface layer, and the top of the surface layer is further provided with a left lane and a right lane. The base layer comprises a granular material base layer and a semi-rigid base layer which are arranged from bottom to top; the right lane is internally provided with a same-direction washboard road and a reverse-direction washboard road, the same-direction washboard road and the reverse-direction washboard road are each provided with a plurality of wave forms which are evenly spaced, and the wave forms on the two roads are arranged in a peak staggering mode; according to the utility model, through unique equidirectional and reverse washboard road waveform peak staggering arrangement, complex vibration working conditions can be simulated; the right lane is provided with a two-percent left-high right-low cross slope, which is beneficial to drainage and prevents accumulated water from influencing the test and damaging the road; the device is simple in structure, small in waveform indirect direction and high in frequency, synchronous construction of the two sides of the washboard road surface can be guaranteed during construction, coordinates and elevation errors of wave crest and wave trough positions of the road surface are effectively reduced, and flatness quality deviation caused by manual control is avoided.
Owner:5TH ENGINEERING LTD OF THE FIRST HIGHWAY ENGINEERING BUREAU CCCC +1

Cross slope bias suppression method and apparatus, electronic device, and storage medium

ActiveCN121133693BControl objectiveSimulation
This application provides a method, apparatus, electronic device, and storage medium for slope offset suppression, relating to the field of automotive technology. The method includes: calculating and acquiring multiple judgment parameters of a target vehicle, determining the real-time integral switch state according to a preset integral switch rule, and updating the compensation integral in real-time based on the target vehicle's real-time operating conditions, lateral deviation, and integral gain coefficient to determine the lane-keeping control command and thus control the target vehicle's steering mechanism for lane keeping. This method determines the real-time integral switch state of the target vehicle through judgment parameters corresponding to the target vehicle's lane-keeping control parameters, and dynamically updates the compensation integral based on the vehicle's real-time operating conditions. It then determines the lane-keeping control command based on the dynamically updated compensation integral, achieving implicit compensation for the impact of slope without relying on slope sensors or explicit estimation of the slope angle. This improves the compatibility and accuracy of slope offset suppression, better ensuring driving safety.
Owner:ZHIZI AUTOMOTIVE TECHNOLOGY CO LTD

Method for positioning and laying precast floating slabs in curved sections

PendingCN122304235AControl systemTrackway
This invention relates to the field of urban rail transit track construction technology, and provides a method for positioning and laying precast floating slabs in curved sections. The method includes: establishing the line benchmark and slab joint projection edge based on CPⅢ control points to determine the fan-shaped slab joint difference; determining the theoretical offset using the mid-vector method, superimposing the additional offset caused by superelevation, and incorporating the internal sliding compensation amount during slab lifting to obtain the comprehensive offset for theoretical positioning; after the slab is suspended and placed, fine-tuning it to within a threshold matching the specifications of the leveling shims in a non-lifting state; and installing lateral supports after fine-tuning to resist inward sliding during slab lifting. This invention upgrades traditional trial-and-error based experience to an active positioning control system with multi-factor coupled calculation, solving the millimeter-level positioning problem of rigid slabs under the coupled effects of curve constraints, cross slope projection, and slab lifting disturbances. It eliminates the inefficient cycle of fine-tuning, lifting, sliding, and readjustment, significantly improving construction efficiency and quality consistency.
Owner:THE 2ND ENG CO LTD OF CHINA RAILWAY 22ND BUREAU GRP +1

A method for automatically generating different types of tunnel construction clearance

PendingCN122365683AGraphicsCarriageway
The application discloses a kind of different types tunnel construction clearance automatic generation method, step (1), establish standard database, tunnel road grade, design speed, lane number and left side maintenance road width, right side maintenance road width, left side lateral width, right side lateral width, driving lane width, residual value one-to-one corresponding storage;Step (2), obtain the tunnel road grade, design speed, lane number input by user, and generate standard construction clearance basic parameters by matching with standard database;Step (3), receive the individualized parameter input by user, including left side widening value, right side widening value, emergency parking width, emergency parking lane cross slope value, maintenance road height;Step (4), set reference point three-dimensional coordinates, based on basic parameters and individualized parameters, the three-dimensional coordinates of each feature point of construction clearance are calculated by trigonometric function;Step (5), according to the feature point coordinates, tunnel construction clearance graphics are automatically drawn and layer, line type and color identification are completed, and the automation and intelligent level of tunnel engineering design is significantly improved.
Owner:SHANDONG TRAFFIC PLANNING DESIGN INST

Tension setting method applying cross slope

The invention relates to a tension setting method applying a cross slope, which is characterized by comprising the following steps of: 1, carrying out range subdivision on the thickness and the width of strip steel according to a product outline; 2, querying four point values of a region boundary in two dimensions; and 3, setting a unit tension value by using a cross slope. According to the scheme, fluctuation of strip steel tension is reduced, the product quality is improved, and field production is more stable and smoother.
Owner:SHANGHAI MEISHAN IRON & STEEL CO LTD

Lane keeping control method and system based on road cross slope estimation and feedforward compensation

The application provides a lane keeping control method and system based on road surface transverse slope estimation and feedforward compensation, and relates to the technical field of automobile auxiliary driving, and the method comprises the following steps: acquiring vehicle state information; adopting a method of low-pass filtering and state observer fusion to estimate a road surface transverse slope angle in real time; calculating a feedforward compensation steering angle based on the estimated transverse slope angle, wherein a feedforward gain is adjusted online and adaptively according to a vehicle speed and a load; calculating a feedback control steering angle by adopting an LQR algorithm based on a transverse deviation and a yaw angle deviation; dynamically weighting and fusing the two by a feedforward-feedback coupling coordinator to generate a target front wheel steering angle and control vehicle steering. The application can effectively eliminate the steady-state transverse deviation caused by the road surface transverse slope, and significantly improve the lane keeping precision, system robustness and driving comfort.
Owner:ZHONGTONG BUS HLDG