Alien soil for slope protection of loess slope plants
A technology for loess and slopes, applied in the direction of botany equipment and methods, applications, fertilizer mixtures, etc., can solve the problems of difficult vegetation protection on slopes, achieve the effects of solving water shortage, simple construction, and improving structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0025] The guest soil includes the following components by weight: 900 parts of sandy loess, 200 parts of soil conditioner (peat soil), 2 parts of water-retaining agent, 0.2 part of binder, and 2 parts of compound fertilizer. It is used for the side slope of loess embankment in section DK248+641.24~DK248+830. The subgrade of this section is located at the entrance of Lujiaya Tunnel.
[0026] There are Quaternary Upper Pleistocene (Q3) sandy loess and Middle Pleistocene (Q2) sandy loess distributed in this section, and the stratum lithology is described as follows:
[0027] Sandy loess (soft soil) (Q3): light yellow, yellowish brown, loose, slightly wet, uniform soil quality, loose structure, containing a few snail fossils, thickness 0-10m, penetration resistance of static penetration 1285~2232kPa, with an average of 1659kPa, which belongs to Class II ordinary soil.
[0028] Sandy loess (Q3): grayish yellow, yellowish brown, slightly dense to medium dense, slightly wet, conta...
Embodiment 2
[0032] The guest soil includes the following components by weight: 860 parts of sandy loess, 120 parts of soil conditioner (peat soil), 1.6 parts of water-retaining agent, 0.5 part of binder, and 3 parts of compound fertilizer. It is used for the loess cutting slope of section DK297+182.94~DK298+420 of Zhengxi Passenger Railway, and the subgrade length of the test section is 1237m. This section belongs to the second terrace of the Yellow River, with an elevation of 370-390m and a relative elevation difference of about 20m. 100-300m on the left side of the line is the Lianhuo Expressway, which is connected with the 310 National Highway by a rural road, so the traffic is more convenient. This section of the project is mainly subgrade, with excavation at both ends and filling in the middle. The maximum filling height in the center is 2.7m, and the deepest excavation height in the center of the cutting is 18.1m. The vegetation on the surface of the loess is not developed, which i...
Embodiment 3
[0040] The guest soil includes the following components by weight: 800 parts of sandy loess, 200 parts of soil conditioner (peat soil), 1 part of water-retaining agent, 1 part of adhesive, and 5 parts of compound fertilizer. It is used for the loess cutting slope of section DK299+210~DK301+949.76 of the Zhengxi Passenger Dedicated Line. This section belongs to the second-level terrace of the Yellow River, with an elevation of 400-430m and a relative elevation difference of about 30m. The terrain is generally flat and open, with slightly higher sides, mostly cultivated land and orchards. There are many residential areas along the route, and there are rural roads connected to National Highway 310, so the traffic is relatively convenient. The line mainly passes through cuttings, and the maximum excavation depth in the center is about 17.9m. The vegetation on the surface of the loess is not developed, which is easy to cause water and soil erosion.
[0041] The stratum of the cutt...
PUM
Property | Measurement | Unit |
---|---|---|
Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com