7.63m coke oven horizontal tube primary cooler cleaning method
A primary cooler and horizontal tube technology, applied in the cleaning system and cleaning field of 7.63m coke oven primary cooler horizontal tube, can solve the problems of water reduction, equipment corrosion, poor cooling effect, etc., to reduce the formation of calcium scale and avoid Effects of equipment corrosion and stable production
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] figure 1 As shown, the 7.63m coke oven horizontal tube primary cooler cleaning system includes a water storage tank 1, which is characterized in that the water storage tank 1 is connected to the water pump 2, and the output pipeline of the water pump 2 passes through the pipeline and cleans the water supply valve 3 and the horizontal tube primary cooling The water inlet pipe of the device 5 is connected, and the cleaning water supply valve 3 is connected between the circulating water inlet valve 4 and the water inlet pipe of the horizontal tube primary cooler 5, and the water outlet pipe of the horizontal tube primary cooler 5 is connected to the storage tank through the pipeline and the water return valve 6. The water tank 1 and the water return valve 6 are installed between the high temperature section and the middle temperature section circulating water outlet valve of the horizontal tube primary cooler and the water outlet pipe.
[0020] 1. Mix sulfamic acid, sulfur...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 