Monitoring method for original well, receiving well and pipe jacking construction

A technology for receiving wells and pipe jacking, which is used in earth-moving drilling, mining equipment, tunnels, etc., can solve the problems of large blasting dosage, deterioration of existing tunnel structures, cracking of linings, etc., so as to improve construction work efficiency and reduce the layout of monitoring points. , the effect of reducing construction costs

Active Publication Date: 2017-06-27
CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP OF THE FIFTH ENG
View PDF6 Cites 14 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to the lack of understanding and attention to the complexity of construction, engineering accidents caused by such problems also occur from time to time. For example, when a second line was added to a single-track railway, the new tunnel was constructed adjacent to the e

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Monitoring method for original well, receiving well and pipe jacking construction
  • Monitoring method for original well, receiving well and pipe jacking construction
  • Monitoring method for original well, receiving well and pipe jacking construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0057] This embodiment is to simplify the construction process, speed up the construction progress, ensure the quality of the structure, save engineering costs, design suitable for starting and receiving wells and pipe jacking construction, optimize the construction process, improve work efficiency, reduce the consumption of materials and materials, and avoid energy waste. , so that it meets the standard construction requirements of a monitoring method for starting and receiving wells and pipe jacking construction. The whole steps are as follows figure 1 Shown:

[0058] Use monitoring technology to monitor the disturbances generated during the starting and receiving wells and pipe jacking construction, including the following steps:

[0059] (1) Conduct construction preparations on site, including engineering geological and hydrogeological surveys;

[0060] (2) Select monitoring points and install monitoring instruments on the monitoring sections of the monitoring points. The...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a monitoring method for an original well, a receiving well and pipe jacking construction. The monitoring method comprises the steps that (1), construction is prepared on site; (2), monitoring points are selected, and monitoring instruments are arranged on monitoring sections of the monitoring points; (3), monitoring frequency is made, and information is collected; (4), collected information data are recorded, analyzed and treated, and a monitoring statement is obtained; (5), a monitoring warning index value is made; and (6), the reasonability and scientificity of the construction process are evaluated according to the monitoring statement and the monitoring warning index value. On the basis of common monitoring items, the monitoring items are combined organically, and the tested data can be mutually checked. Continuous monitoring is conducted in construction engineering to guarantee the continuity of the data; monitoring point arranging is reduced by utilizing the system effect, so that the cost is saved; and by combining construction practice, the testing method and the types of monitoring elements are determined, and the arranging positions of the monitoring points are adjusted, so that the influence on the construction quality is reduced.

Description

technical field [0001] The invention relates to a civil engineering monitoring method, in particular to a monitoring method for starting and receiving wells and pipe jacking construction. Background technique [0002] With the development of my country's national economy, the demand for infrastructure, especially for transportation facilities, is increasing, and land transportation such as railways and highways is the first to bear the brunt; at the same time, high-level traffic arteries have also achieved unprecedented development, such as: High-speed, heavy-duty railways and expressways are the main directions for the development of land transportation such as railways and highways respectively, and the construction of urban subways and highway tunnels is an important means to ease urban traffic. The improvement and capacity expansion of transportation facilities, vehicle speed increase and the development of expressway network inevitably lead to the emergence of a large nu...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E21D9/00
CPCE21D9/00E21D9/003
Inventor 苏春生
Owner CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP OF THE FIFTH ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products