Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A monitoring method for starting and receiving wells and pipe jacking construction

A technology for receiving wells and pipe jacking, which is applied to earthwork drilling, mining equipment, tunnels, etc., and can solve problems such as lining cracking, large amount of blasting chemicals, and deterioration of existing tunnel structures, so as to reduce construction costs, improve construction efficiency, Reduce the effect of monitoring point layout

Active Publication Date: 2019-05-10
CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP OF THE FIFTH ENG
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to the lack of understanding and attention to the complexity of construction, engineering accidents caused by such problems also occur from time to time. For example, when a second line was added to a single-track railway, the new tunnel was constructed adjacent to the existing tunnel. The deteriorated existing tunnel structure deteriorated further; a highway tunnel passed through the goaf, due to insufficient investigation in advance, no countermeasures were taken during design, resulting in cracking of the lining after construction, etc.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A monitoring method for starting and receiving wells and pipe jacking construction
  • A monitoring method for starting and receiving wells and pipe jacking construction
  • A monitoring method for starting and receiving wells and pipe jacking construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0057] This embodiment is to simplify the construction process, accelerate the construction progress, ensure the quality of the structure, save the project cost, design suitable for launching, receiving well and pipe jacking construction, optimize the construction process, improve work efficiency, reduce material and material consumption, and avoid energy waste A monitoring method for launching, receiving well and pipe jacking construction to meet the requirements of standardized construction. The whole steps are as follows figure 1 Shown:

[0058] Using monitoring technology to monitor the disturbances generated during the construction of the launching and receiving wells and pipe jacking includes the following steps:

[0059] (1) Carry out construction preparations on site, including surveys of engineering geology and hydrogeology;

[0060] (2) Select monitoring points and set up monitoring instruments on the monitoring section of the monitoring points. The monitoring points includ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a monitoring method for an original well, a receiving well and pipe jacking construction. The monitoring method comprises the steps that (1), construction is prepared on site; (2), monitoring points are selected, and monitoring instruments are arranged on monitoring sections of the monitoring points; (3), monitoring frequency is made, and information is collected; (4), collected information data are recorded, analyzed and treated, and a monitoring statement is obtained; (5), a monitoring warning index value is made; and (6), the reasonability and scientificity of the construction process are evaluated according to the monitoring statement and the monitoring warning index value. On the basis of common monitoring items, the monitoring items are combined organically, and the tested data can be mutually checked. Continuous monitoring is conducted in construction engineering to guarantee the continuity of the data; monitoring point arranging is reduced by utilizing the system effect, so that the cost is saved; and by combining construction practice, the testing method and the types of monitoring elements are determined, and the arranging positions of the monitoring points are adjusted, so that the influence on the construction quality is reduced.

Description

Technical field [0001] The invention relates to a monitoring method for civil engineering, in particular to a monitoring method for launching, receiving well and pipe jacking construction. Background technique [0002] With the development of my country's national economy, the demand for infrastructure, especially transportation facilities, is increasing, and land transportation such as railways and highways is the first to bear the brunt. At the same time, high-grade traffic arteries have also seen unprecedented development, such as: High-speed, heavy-duty railways and expressways are the main directions for the development of land transportation such as railways and highways, while the construction of urban subways and highway tunnels is an important means to ease urban traffic. The improvement and expansion of transportation facilities, the speeding of vehicles and the development of highway networks will inevitably cause a large number of nearby construction projects such as n...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D9/00
CPCE21D9/00E21D9/003
Inventor 苏春生
Owner CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP OF THE FIFTH ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products