Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

109 results about "System effects" patented technology

Furnace condition optimizing and monitoring device and method using same for optimizing

The invention discloses a furnace condition optimizing and monitoring device which improves operational conditions of a heating furnace or a boiler, improves efficiency and reduces energy consumption. A combustion device optimizing unit which is mainly an oxygen content fine adjustment device and is controlled by an automatic control unit is further arranged on an air inlet of a combustor, and the fine adjustment device comprises a control circuit with an optimization command receiving microprocessor. The furnace condition optimizing and monitoring device further comprises a curve memory comparison unit and a security and protection failure warning unit which carries out warning reminding on monitoring the project that the content of oxygen in exhausted smoke of the heating furnace is too high, and the like. According to the furnace condition optimizing and monitoring device, a security and protection effect-improving device which is matched in an integrated mode is adopted, a device monitoring and control system which integrates furnace condition overall optimization, safe production monitoring, machine pump system effect improving, automatic adjustment and operation, energy saving and consumption reduction as a whole is also adopted, the furnace effect of a heating furnace or a boiler matched with the furnace condition optimizing and monitoring device is improved, emission of oxygen content of smoke gas of the heating furnace or the boiler is reduced, smoke exhaust temperature and energy consumption of the heating furnace or the boiler are reduced, and therefore effective work of operation of a machine pump of the heating furnace or the boiler is enlarged, operation efficiency of the heating furnace or the machine pump of the boiler is improved, and the service life of the heating furnace or the machine pump of the boiler is prolonged.
Owner:SHENZHEN JIAYUNTONG ELECTRONICS

Pilot signal design method used for maximizing effect and large-scale multi-antenna system

The invention discloses a pilot signal design method used for maximizing effect and a large-scale multi-antenna system. The system is constituted by a base station configured with a large-scale antenna array and a user configured with a single antenna. The base station is used to transmit a downlink pilot signal to the user, and channel estimation is completed on a user terminal, and then estimation information is fed back to the base station, and then the base station adopts a maximized received signal-to-noise ratio wave beam forming scheme for data transmission. According to the invention,by taking the maximization of the system effect as an object, and the pilot signal as an optimization variable, a mathematical model is established; by adopting a certainty equivalency principle, an approximate analytical expression of a target function is acquired, and then the structure of the optimal pilot signal is deduced by adopting a majorization theory; properties are planned according tofractions, and an original optimization problem is converted into an equivalent subtraction form, and therefore an iterative optimization algorithm is acquired, and then by adopting a Lagrange dualitymethod, the closed-form solution of the optimal pilot signal is acquired.
Owner:ZHENGZHOU UNIVERSITY OF AERONAUTICS

Grid type transverse air-intake turbulent flow type electric dust remover

The invention relates to a grid type transverse air-intake turbulent flow type electric dust remover comprising a dust removing device and a vibrator, wherein the dust removing device uses mutliple rows of transverse turbulent flow air-intake grid plates as anode plates, the transverse turbulent flow air-intake grid plates are parallel to an air flow, a cathode wire and a gap used as a flue gas channel are arranged between the adjacent transverse turbulent flow air-intake grid plates in each row, the front ends of the flue gas channels formed by each row of transverse turbulent flow air-intake grid plates are provided with front seal plates at intervals to form a high-voltage electric field outlet channel, the back ends are provided with back seal plates at intervals to form a high-voltage electric field inlet channel, and the high-voltage electric field outlet channel is adjacent to the high-voltage electric field inlet channel. The invention adopts grid type transverse air intake to replace the longitudinal air intake of the conventional dust remover so that tail gas in the electric dust remover is changed into a novel turbulent flow state from the conventional basic layer flow state, the moving route and the running time of charged particles in the dust remover are prolonged so that the opportunity of capturing the charged particles close to or even directly contacting an easy-absorption pole is greatly increased, and meanwhile, a vibration system has a good effect to ensure that the polar plates of the dust remover are clean.
Owner:LIAOCHENG LUXI CHEM ENG DESIGN

Monitoring method for original well, receiving well and pipe jacking construction

ActiveCN106894821AEffective four-dimensional spaceGuaranteed continuityTunnelsEngineeringContinuous monitoring
The invention discloses a monitoring method for an original well, a receiving well and pipe jacking construction. The monitoring method comprises the steps that (1), construction is prepared on site; (2), monitoring points are selected, and monitoring instruments are arranged on monitoring sections of the monitoring points; (3), monitoring frequency is made, and information is collected; (4), collected information data are recorded, analyzed and treated, and a monitoring statement is obtained; (5), a monitoring warning index value is made; and (6), the reasonability and scientificity of the construction process are evaluated according to the monitoring statement and the monitoring warning index value. On the basis of common monitoring items, the monitoring items are combined organically, and the tested data can be mutually checked. Continuous monitoring is conducted in construction engineering to guarantee the continuity of the data; monitoring point arranging is reduced by utilizing the system effect, so that the cost is saved; and by combining construction practice, the testing method and the types of monitoring elements are determined, and the arranging positions of the monitoring points are adjusted, so that the influence on the construction quality is reduced.
Owner:CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP OF THE FIFTH ENG

Heat and power synergistic system and method based on reheating and heat accumulation adjustment

The invention discloses a heat and power synergistic system and method based on reheating and heat accumulation adjustment. The system comprises a high-pressure turbine, a medium-low-pressure steam turbine, a power generator, a boiler, a hot water tank, a heat accumulation steam make-up pump, a reheating and heat accumulation bypass, a heat accumulator, a heating station, a steam extraction and heat supply branch, a heat accumulation and steam supply branch, a heat accumulation and steam supply control valve, a reheating and heat accumulation bypass valve, a reheater, a reheating branch, a hotwater heat pump, a hot water heat supply branch and a hot water user. The problem that consideration to both heat and power cannot be achieved in the peak shaving process since a traditional heat andpower unit sets power according to heat or set the heat according to the power is solved to a certain extent, the effect of excess power generation on the premise of meeting the heat supply requirement is achieved, the problem that the heat requirement is not sufficient on the condition of meeting the power generation requirement, particularly the problem that the heat requirement is not sufficient is solved, and the thermoelectric power system effect of the unit is improved and the system and the method have very good application prospects.
Owner:ZHEJIANG UNIV

Large target surface low illumination level all-celestial shooting system

ActiveCN105530415AIncrease the effective apertureReduce edge distortionTelevision system detailsColor television detailsVisual field lossIlluminance
The invention discloses a large target surface low illumination level all-celestial shooting system, comprising a sensing chip, a rectangular prism and two wide-angle lenses. The rectangular prism is provided with two reflection surfaces; the two wide-angle lenses are symmetrically arranged on two sides of the rectangular prism and a 45-degree included angle is formed between the incident light axis of each wide-angle lens and the reflection surface of the corresponding side; the 45-degree included angles are formed between the sensing chip and the two reflection surfaces; the visual field angle of the wide angle lens is more than 220 degrees and F-Theta distortion is smaller than 15%; the effective rear intercept of the wide angle lens is greater than 5.6mm; the system utilizes two wide angle lenses with visual field angles greater than 220 degree to converge the light rays which are then imaged on the same sensor chip after refraction by the rectangular prism; two wide angle lens commonly use one sensor chip to constitute a large target low illumination level all-celestial shooting system, which increases the effective aperture of the system, reduces the distortion of the edge of the system, greatly improves the resolution ratio of the integral system and enables the system effect to achieve the all dimension 720 degree visual effect.
Owner:FOCTEK PHOTONICS LNC
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products