Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A Method of Train Operation Day Planning Based on Equilibrium Operation

A train and planning technology, applied in the field of rail transit

Inactive Publication Date: 2020-10-20
NANJING UNIV OF SCI & TECH
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, there is little research on the scheduling algorithm of subway vehicle operation day, because the purpose of EMU operation planning and subway operation day planning in the field of railway transportation is to provide vehicles in good condition for train operation or operation planning, so as to To meet the given transportation tasks, it has a certain reference significance for the research on the problem of EMU operation planning

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A Method of Train Operation Day Planning Based on Equilibrium Operation
  • A Method of Train Operation Day Planning Based on Equilibrium Operation
  • A Method of Train Operation Day Planning Based on Equilibrium Operation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0103] Before starting the operation on the second day, the evening shift dispatcher needs to prepare the vehicle operation day plan. First, select the timetable template for the second day, including serial number, train number, planned departure time, and planned return train number. Taking the timetable template for a certain subway vehicle operation day as an example, as shown in Table 1, the morning peak train number is 0202, 0402, 0702, 1002, evening peak trains are 1702, 1802, 1902, 2002, each train has its departure direction, in this example, the departure direction of 0102, 0302, 0402, 0602, 0902, 1102 is the upward direction, The departure direction of the rest of the trains is the downward direction.

[0104] Table 1 Timetable of a certain subway vehicle operation day

[0105]

[0106]

[0107] Verify the effectiveness of the algorithm, and establish a simulation platform for the train operation day plan allocation method. According to experience, set the r...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a balanced application-based train operation daily plan allocation method. The method includes the following steps that: data information required by the algorithm are collected; trains which operate in morning peaks, trains which have requirements for specified train numbers, and corresponding train numbers are reserved; a train number and train matching matrix is created according to the matching degrees of the train numbers and the trains; a train tabu list is created according to the parking conditions and track occupation conditions of all trains; trains which are assigned to a train number are selected according the above information; when the trains are selected, whether a current train number has a track constraint, if the current train number has the track constraint, selectable train numbers are determined according to the requirement of the constraint and a train parking location table; the intersection of the train number set and an available train set in the train tabu list is obtained; proper trains are selected from the above intersection according to a corresponding rule so as to be assigned to the train number; and the train tabu list is updated, and the above steps are repeated until all train numbers are filled. With the method of the invention adopted, the reliability and efficiency of train operation are improved, and the safety of the driving of the trains is ensured.

Description

technical field [0001] The invention belongs to the technical field of rail transit, in particular to a train operation day plan allocation method based on balanced operation. Background technique [0002] Train operation day plan allocation refers to selecting vehicles in good condition to serve as corresponding train numbers in the template after selecting the train operation day plan template for the second day. At present, the traditional manual allocation method is still used for planning, that is, the maintenance scheduling is matched according to the subjective status of the vehicle, parking location, etc. Since the mileage corresponding to different trains is often different, the mileage during the operation of the vehicle will also vary. If there is a large difference, the reliability of the vehicle with a large mileage will be lower than the threshold during the maintenance period, resulting in an increase in the driving unsafety factor. For vehicles with a small m...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/10G06Q10/04G06Q50/30
CPCG06Q10/04G06Q10/109G06Q50/30
Inventor 臧瑶徐坤黄瑛尹希珂邢宗义
Owner NANJING UNIV OF SCI & TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products