A power control method for preheating of inverter compressor
A variable frequency compressor and power supply control technology, applied in heating methods, heating and ventilation control systems, refrigerators, etc., can solve the problems of rough conditions for judging whether to generate heat, failure of preheating function, waste of power resources, etc., and achieve a control method Easy, avoid waste, judge the effect of precise conditions
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] Example 1, such as Figure 2~3 As shown, the embodiment of the present invention provides a power supply control method for inverter compressor preheating, and the specific operation steps are as follows:
[0045] Step (1), after the air conditioner is powered on, the air conditioner starts to run;
[0046] Step (2), the indoor unit control relay is closed, the indoor unit supplies power to the outdoor unit, and the power supply time is Ft;
[0047] Step (3) Judging whether the outdoor ambient temperature meets the preheating condition, the judging condition is T outer ring < TEMP, if yes, go to step (4), if not, go to step (7);
[0048] Step (4), judging whether the temperature of the outdoor coil meets the preheating condition, the judging condition is Touter disk <(TEMP+∆t), if yes, go to step (5), if not, go to step (7);
[0049] Wherein, the power supply duration Ft is the default power supply duration of the indoor unit to the outdoor unit, and the power supply ...
Embodiment 2
[0062] Embodiment 2. However, during the use of the air conditioner, the air conditioner may only be in the standby state. After the air conditioner receives the operation command, the indoor unit first judges whether it is the first power-on, and if so, enters the Step (2) in Embodiment 1 performs subsequent selection and judgment. If it is not the first power-on, the indoor unit judges whether the standby time is greater than T2. If the standby time is greater than T2, enter step (2) in Embodiment 1 and perform subsequent Select judgment; if the standby time is not greater than T2, then judge whether the indoor unit has received the compulsory power supply demand from the outdoor unit, if the indoor unit has always received the compulsory power supply demand from the outdoor unit, then supply power to the outdoor unit all the time, and enter the steps in embodiment 1 (2) And make subsequent selection judgments; if the indoor unit does not receive the compulsory power supply...
Embodiment 3
[0063] Embodiment 3, as a complete embodiment of the present invention, includes both power-on for the first time and power-on after standby, and the specific steps are as follows:
[0064] Step (1), after the air conditioner is turned on, first judge whether the air conditioner is powered for the first time; if so, go to step (4); if not, go to step (2);
[0065] Step (2), judge whether the standby time of the air conditioner is greater than T2, if so, go to step (4), if not, go to step (3);
[0066] Step (3), judging whether the indoor unit has received the mandatory power supply demand from the outdoor unit, if so, proceed to step (4), if not, do not send the mandatory power supply communication code to the indoor unit and proceed to step (12);
[0067] In step (4), the control relay of the indoor unit is first closed, and power is supplied to the outdoor unit for a duration of Ft. After the power supply is completed, go to step (5);
[0068] Step (5), judging whether the ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com