Industrial park microgrid electric heating integrated scheduling method based on distributed cleaning heating

A technology for industrial parks and joint scheduling, applied in control/regulation systems, instruments, adaptive control, etc., can solve problems such as difficulty in reflecting indoor temperature and difficulty in application, and achieve resource utilization efficiency, improve economy, and promote rationality. effect of development

Active Publication Date: 2018-07-24
STATE GRID TIANJIN ELECTRIC POWER +2
View PDF4 Cites 16 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] However, there are certain limitations in the currently commonly used dispatching method of electricity and heat combined dispatching to accommodate new energy.
First, the scheduling method is mainly suitable for energy supply systems dominated by cogeneration units. It mainly uses the idea of ​​decoupling electric heating to expand the consumption space for new energy, but it is difficult to apply to the use of distributed clean heating equipment for heat supply. The system, distributed heating and heat storage devices are distributed in each building with heating demand, which can be flexibly adjusted according to the characteristics of the building, and can participate in the consumption of new energy itself; second, it is difficult to express the heat demand with a fixed curve Considering the indoor temperature, in fact, the change of indoor temperature is an important parameter of the heating system, which can reflect the quality of heating and the comfort of users

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Industrial park microgrid electric heating integrated scheduling method based on distributed cleaning heating
  • Industrial park microgrid electric heating integrated scheduling method based on distributed cleaning heating
  • Industrial park microgrid electric heating integrated scheduling method based on distributed cleaning heating

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0048] In the following, a detailed description will be given of the distributed clean heating-based micro-grid electric-heat joint scheduling method in industrial parks of the present invention in combination with the embodiments and the accompanying drawings.

[0049] like figure 1 As shown, the distributed clean heating-based micro-grid electric-heat joint scheduling method in industrial parks of the present invention includes the following steps:

[0050] 1) Establish the overall architecture of the park micro-grid based on distributed heating, including building-level electric heat supply system and park-level collaborative power supply system; the building-level electric heat supply system includes: air source heat pump, heat storage device and rooftop photovoltaic; The park-level collaborative power supply system includes: external grid, distribution lines and centralized photovoltaic corridors.

[0051] 2) Construct a micro-grid simulation model of the industrial park...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The present invention provides an industrial park microgrid electric heating integrated scheduling method based on distributed cleaning heating. The method comprises the steps of: establishing an industrial park microgrid whole frame based on distributed heating, wherein the whole frame comprises a building electric heating supply system and an industrial park cooperative power supply system; constructing an industrial park microgrid simulation model, wherein the industrial park microgrid simulation model a building heat balance model, an air source heat pump model and a heat storage device model; constructing an industrial park microgrid day-ahead economic scheduling model, wherein the industrial park microgrid day-ahead economic scheduling model comprises a target function, an electric power balance constraint condition, an indoor temperature constraint condition, an air source heat pump heat power constraint condition, an energy storage capacity constraint condition, an energy storage device power constraint condition, a photovoltaic network power constraint condition and a power flow constraint condition; and providing a microgrid scheduling solution method based on the geneticalgorithm, wherein the microgrid scheduling solution method comprises individual screening and modification and optimizing of part of the genetic algorithm. The industrial park microgrid electric heating integrated scheduling method based on distributed cleaning heating can provide a technical support for scheduling of an industrial park by taking distributed cleaning heating as a core to facilitate improvement of the energy integral utilization and the management level and prompt the reasonable development of an industrial park micro energy grid.

Description

technical field [0001] The invention relates to a microgrid scheduling method. In particular, it relates to an industrial park micro-grid electric-heat joint scheduling method based on distributed clean heating, which is suitable for the day-ahead scheduling work of energy suppliers in industrial parks. Background technique [0002] With the development of the energy Internet, the coordinated supply of electricity / heat / gas has become an inevitable trend of future energy supply. Due to its clean and efficient energy supply characteristics, electricity / heat / gas combined supply has many applications in new industrial parks, but it also brings a series of problems. On the one hand, the park has space resources for building a large number of photovoltaic and other new energy power generation equipment and the load is relatively concentrated, which is conducive to solving the problems of poor investment returns and high energy loss caused by long-distance power supply, but it inc...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G05B13/04
CPCG05B13/042
Inventor 王世举徐晶刘洪李娟张雪菲张章徐科王哲迟福建王亦然刘晓鸥
Owner STATE GRID TIANJIN ELECTRIC POWER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products