Construction method of low-clearance swivel bridge spanning operation line
An operating line, low-net technology, used in bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as large closing deviation, large friction between support feet and slideways, deformation, etc., to reduce friction coefficient, reduce Small traction, ensure the effect of turning
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0082] The present invention will be further described in detail below in conjunction with test examples and specific embodiments. However, it should not be understood that the scope of the above subject matter of the present invention is limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.
[0083] like figure 1 As shown, a construction method of a low-clearance swivel bridge across the operating line includes the following steps:
[0084] a: preparation for turning;
[0085] a1: Relocate or modify the optical cables and cables that interfere with the piers and support foundations of continuous beams;
[0086] a2: construction protection pile;
[0087] a3: Pre-embedded parts such as the pile foundation and cap of the construction main pier, and the lower turntable spherical joint skeleton;
[0088] a4: The pile foundation, cap and pier body of the construction side p...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com