An iron tower capable of coping with uneven settlement of mining area and its righting method
A technology for mining areas and iron towers, which is applied to towers, building types, buildings, etc., can solve problems such as unsatisfactory righting effects and deterioration of the stress status of iron towers. High operability effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0079] The invention provides an iron tower that can cope with uneven settlement in a mining area, the iron tower includes a tower body, a tower foot and a foundation;
[0080] The lower end of the tower foot is connected to the foundation through a shoe plate;
[0081] The upper end of the tower foot is provided with two parallel connection ears, and a row of uniform connection holes is arranged on the connection ears, and the connection between the tower body and the tower foot is provided with a The groove matching the connecting ear, the thickness of the tower body outside the groove is equal to the distance between the two connecting ears, and the tower body outside the groove is provided with a channel matching the connecting hole and the number is smaller than the connecting hole. hole;
[0082] A level sensor ⑩ is provided on the crossbeam of the tower body;
[0083] Spatial coordinate locators are respectively arranged on the feet of the tower;
[0084] The tower b...
Embodiment 2
[0091] Based on the same inventive concept, the present invention also provides a construction method for straightening iron towers in response to uneven settlement in the mining area, said method comprising the following steps:
[0092] (1) Determine the predicted righting result according to the reference point, the slope angle of the tower body and the root opening data;
[0093] (2) According to the predicted righting result, install the replacement shoe plate of the tower foot with the most significant settlement on the foundation iron plate And remove the tower foot with the most significant settlement connection to the foundation;
[0094] (3) unfold the tension wire respectively and straighten the iron tower through the tension wire;
[0095] (4) Lengthen the foot of the tower with the most significant settlement according to the predicted straightening results
[0096] The straightening result determined according to the reference point, the slope angle of the ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com