Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Secondary equipment sequential control method and system for associating primary equipment running status

A technology of primary equipment and operating status, applied in the direction of switchgear, electrical components, etc., can solve the problems of less research on the operation sequence control of protection devices, error-prone, low work efficiency, etc.

Active Publication Date: 2020-03-06
STATE GRID SHANDONG ELECTRIC POWER +1
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the return of secondary equipment and the implementation of safety measures still adopt the traditional operation ticket form, and manual return and check are carried out one by one. This method is inefficient and error-prone.
Moreover, the current substation sequence control operation is mainly aimed at the running state, and there are few studies on the operation sequence control of the protection device.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

example 1

[0127] Example 1: 220kV line A set of line protection PCS-931 protection equipment state judgment pressure plate set:

[0128] All soft pressure plates of A set of line protection devices (excluding A set of busbar protection Qiyuan jump soft pressure plates) and hard pressure plates for device maintenance;

[0129] A set of merging unit device maintenance hard pressure plate;

[0130] A set of intelligent terminal device maintenance hard pressure plate;

[0131] In the busbar protection device of A set, the failure of the branch circuit is driven into the soft pressure plate and the SV current is driven into the soft pressure plate;

[0132] B set of line protection reclosing outlet soft pressure plate.

example 2

[0133] Example 2: 220kV A set of busbar protection PCS-915 protection equipment state judgment pressure plate set:

[0134] All soft pressure plates of A set of busbar protection devices (excluding all branch circuit failure input soft pressure plates and SV current input soft pressure plates) and hard pressure plates for device maintenance;

[0135] A set of voltage merging unit device maintenance hard pressure plate;

[0136] A set of busbar protection Qiyuanju soft pressure plate for all line branches;

[0137] The A set of busbar protection failure of all main transformer branches trips the soft pressure plate.

[0138] Enter the input and withdrawal status of this group of soft pressure plates corresponding to the protection device in the input, exit and maintenance states into the advanced application system for intelligent operation and maintenance of secondary equipment; for example: to determine the protection of the RCS-931 protection device for a certain line A set...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a sequential secondary device control method with association of the running state of a primary device. The method comprises: a corresponding operation task in each sequentialcontrol operation application scenario as well as a sequential control operation corresponding to the operation task is preset; a sequential control operation application scenario is selected and an operation task in the sequential control operation application scenario and a sequential control operation corresponding to the operation task are performed automatically; after sequential control operation ending, actual investment and exit states of one group of soft pressing plates corresponding to a protection device are obtained automatically; and the actual investment and exit states are compared with the investment and exit states of the group of soft pressing plates in a preset target investment and exit state of the protection device. According to the invention, the corresponding sequential control operation is performed automatically based on the operation task and thus automatic investment and exit of the protection device and automatic execution of the safety measures are completed; and the operation and maintenance personnel or the maintenance personnel does not need to select the specific process of the sequential control operation.

Description

technical field [0001] The invention relates to the technical field of online operation and maintenance of secondary equipment in intelligent substations, in particular to a sequential control method and system for secondary equipment associated with the operating status of primary equipment. Background technique [0002] In recent years, the development of communication network technology has created conditions for the application and promotion of smart substations, which has continuously improved the intelligence of substations. The smart substation replaces the hard wiring of the traditional substation with three layers and two networks, creating good technical conditions for the maintenance and status monitoring of relay protection equipment. [0003] The smart substation replaces the hard wiring of the traditional substation through optical fiber communication. The traditional secondary circuit wiring is expressed as an invisible abstract network message, which increase...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): H02B3/00
CPCH02B3/00
Inventor 李乃永惠杰涂大鹏乔凯李璨孙伟李玉敦冯迎春
Owner STATE GRID SHANDONG ELECTRIC POWER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products