Dispatching method and system for AC/DC hybrid distribution network comprising power electronic transformer
An AC-DC hybrid, power electronic technology, applied in the direction of AC networks with the same frequency with different sources, etc., can solve the problem that the scheduling scheme is not optimal.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0079] Such as figure 1 As shown, the flow chart of the scheduling method for the AC-DC hybrid distribution network including power electronic transformers provided by the present invention includes:
[0080] Step S1, obtaining the operating parameters of the AC / DC hybrid distribution network including the power electronic transformer;
[0081] Step S2, based on the operating parameters and the pre-built coupling optimization model, obtain the active output of the distributed power supply in the AC network and the active output of the PET port of the power electronic transformer;
[0082] Step S3, dispatching the AC-DC hybrid distribution network based on the active output of the distributed power sources in the AC network and the active output of the PET port of the power electronic transformer.
[0083] Such as figure 2As shown, it is a detailed flow chart of the optimization method for the AC-DC hybrid distribution network including power electronic transformers provided...
Embodiment 2
[0160] Based on the same inventive concept, the present invention also provides a dispatching system for an AC / DC hybrid distribution network including power electronic transformers, including:
[0161] An acquisition module, configured to acquire operating parameters of an AC / DC hybrid distribution network including a power electronic transformer;
[0162] A solving module is used to obtain the active output of the distributed power supply in the AC network and the active output of the PET port of the power electronic transformer based on the operating parameters and the pre-built coupling optimization model;
[0163] The scheduling module is used to schedule the AC-DC hybrid distribution network based on the active output of the distributed power supply in the AC network and the active output of the PET port of the power electronic transformer.
[0164] In an embodiment, the system further includes a construction module for constructing a coupling optimization model;
[016...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com