Subway construction surface subsidence early warning method based on case-based reasoning and system dynamics
A system dynamics and surface subsidence technology, applied in the field of subway construction surface subsidence early warning based on case reasoning and system dynamics, can solve problems such as impact, difficulty meeting accuracy requirements, and error in prediction results.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0033] The present invention will be described in detail below in combination with specific embodiments.
[0034] The technical scheme of the present invention is as figure 1 with figure 2 shown, including the following steps:
[0035] 1. Build a case base based on domain knowledge
[0036] In actual engineering, the premise of modeling and predicting surface settlement is to obtain the monitoring data during the tunnel advancement process, so as to obtain the fitting curve and back analysis parameters. It can be seen that if the assumptions about the distribution and properties of the internal structure of the stratum violate the reality, the results will be very different. In fact, urban geology in complex environments is often difficult to accurately describe, which inevitably leads to certain lags and limitations in safety control. . Case-based reasoning (CBR: Case-based reasoning) is a knowledge-based problem-solving and learning method that can use existing experien...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com