Data processing system for marketization project

A data processing system and project technology, applied in the field of data processing systems, can solve problems such as inaccurate amounts of office expenses for low-consumption materials, incomplete statistics of labor costs, etc., and achieve the effect of good development potential and mature technology

CN110503386AActive Publication Date: 2019-11-26STATE GRID HEBEI ENERGY TECH SERVICE CO LTD +2
10 Cites 1 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Publication Date
2019-11-26

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention discloses a data processing system for a marketization project. The data processing system comprises a contract management module, a personnel management module, a production task execution management module, a travel fee approval sheet module, a cost collection accounting module, a contract fee collection module, a laboratory man-hour library module and a statistical analysis modulefor data of the modules. The system has advancement; project can reach the mature and advanced standard of the technology in the aspects of a system structure and a system function, the requirementsof the current and foreseeable future time are met, and other related service requirements are also considered, so that the whole system keeps the advanced technology within a period of time, and hasgood development potential to adapt to the requirements of future informatization development and technology upgrading.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to a data processing system for marketization projects, belonging to the field of data processing. Background technique

[0002] In recent years, the State Grid Corporation of China has called on to vigorously carry out production and construction activities on the basis of increasing investment in scientific research activities, and strive to transform scientific research results into industrial benefits, which have achieved remarkable application results. However, in the process of exploring project lean management, due to the lack of information technology support, there are many front-end data source problems such as incomplete labor cost statistics for many projects, and inaccurate amount of low-consumption materials and office expenses. How to establish a market-oriented project management system to carry out multi-dimensional and lean financial management and control for projects, standardize the entry of various expenses d...

Examples

Embodiment Construction

[0054]The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only a part of the embodiments of the present application, but not all of the embodiments. The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the application, its application, or uses. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present application.

[0055] It should be noted that the terminology used herein is for the purpose of describing specific embodiments only, and is not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly dictates otherwise, th...