High-proportion wind power access power grid ultra-short-term scheduling plan robust optimization method
A technology that is robust in planning and connected to the power grid. It is applied in calculation, calculation model, chaos model, etc., and can solve problems such as low load rate, inability to reflect the degree of influence, and unbalanced transmission power distribution.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0009] The preferred embodiments will be described in detail below in conjunction with the accompanying drawings. It should be emphasized that the following description is only exemplary and not intended to limit the scope of the invention and its application.
[0010] The purpose of the present invention is to provide a robust optimization method for the ultra-short-term scheduling plan of high-proportion wind power connected to the power grid, which can minimize the risk of section violation for the dispatching operation of large-scale wind power sent through tie lines Provide evidence.
[0011] The following three steps (attached figure 1 ) to introduce the proposed method.
[0012] Step 1. Establish a robust optimization model for ultra-short-term scheduling plans.
[0013] 1) Objective function.
[0014] The objective function is to take the minimum safety goal of the square of the cross-section risk balance, and the minimum economic goal of the buffer unit operation ...