High-proportion wind power access power grid ultra-short-term scheduling plan robust optimization method

A technology that is robust in planning and connected to the power grid. It is applied in calculation, calculation model, chaos model, etc., and can solve problems such as low load rate, inability to reflect the degree of influence, and unbalanced transmission power distribution.

Pending Publication Date: 2019-12-24
NORTH CHINA ELECTRIC POWER UNIV (BAODING) +3
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In the formulation of the ultra-short-term dispatch plan, for the transmission section, it is usually used as a constraint condition that it does not exceed the limit, which may lead to the best economic efficiency and safety constraints in the current dispatch period, but the transmission power of each line in the transmission section The distribution is unbalanced, and the transmission power of some lines is close to the limit while the load rate of other lines is too low. Therefore, the section load balance degree is taken into consideration, and the section load balance degree is used to measure the power of the section in each line in the section. Degree of uneven distribution
However, the line load rate and section load balance can only measure the degree to which the line is close to its own limit and the unevenness of power distribution in the section, and cannot reflect the influence of the line in the section on the risk of crossing the limit of the section.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • High-proportion wind power access power grid ultra-short-term scheduling plan robust optimization method
  • High-proportion wind power access power grid ultra-short-term scheduling plan robust optimization method
  • High-proportion wind power access power grid ultra-short-term scheduling plan robust optimization method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0009] The preferred embodiments will be described in detail below in conjunction with the accompanying drawings. It should be emphasized that the following description is only exemplary and not intended to limit the scope of the invention and its application.

[0010] The purpose of the present invention is to provide a robust optimization method for the ultra-short-term scheduling plan of high-proportion wind power connected to the power grid, which can minimize the risk of section violation for the dispatching operation of large-scale wind power sent through tie lines Provide evidence.

[0011] The following three steps (attached figure 1 ) to introduce the proposed method.

[0012] Step 1. Establish a robust optimization model for ultra-short-term scheduling plans.

[0013] 1) Objective function.

[0014] The objective function is to take the minimum safety goal of the square of the cross-section risk balance, and the minimum economic goal of the buffer unit operation ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a high-proportion wind power access power grid ultra-short-term scheduling plan robust optimization method considering section out-of-limit risk balance degree. For a system with high-proportion wind power access, the wind power is snet out through a tie line is an important way to consume the wind power. Based on wind power output probability characteristics, constructingan ultra-short-term scheduling plan robust optimization model; carrying out approximation and linearization processing on non-integratable items in a model objective function; and solving the model byadopting a chaotic quantum particle swarm algorithm to obtain the output of the buffer unit and the wind power receiving interval of each node, thereby realizing an ultra-short-term scheduling plan with minimum section out-of-limit risk and optimal economical efficiency for power distribution balance of each line of the power transmission section. The invention provides a robust optimization method for an ultra-short-term scheduling plan of a high-proportion wind power access power grid considering section out-of-limit risk balance degree, which can provide a basis for realizing minimum section out-of-limit risk for ultra-short-term scheduling of large-scale wind power sent out through a tie line.

Description

technical field [0001] The invention belongs to the field of electric power system dispatching methods, and in particular relates to a robust optimization method for ultra-short-term dispatching plans considering the cross-section risk balance degree for a power grid with a high proportion of wind power connected. Background technique [0002] With the continuous increase of installed capacity of wind power in major wind power bases in my country, in the balance of electricity and electricity, wind power output will change from being only a supplement to conventional energy to "equal share" with conventional energy. However, as the proportion of wind power in the system continues to increase, the randomness and volatility of wind power output increase the difficulty of dispatching decision-making control. Therefore, it is necessary to fully consider system security and economic issues and formulate a reasonable power system dispatching plan with a high proportion of wind powe...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/06G06N3/00G06N7/08
CPCG06Q10/04G06Q10/06313G06Q10/0635G06Q50/06G06N3/008G06N7/08
Inventor张雨薇刘文颖汪宁渤夏鹏周强王方雨陈钊朱丹丹丁坤张尧翔马明许春蕾荣俊杰聂雅楠李宛齐冉忠胡阳朱丽萍李潇陈鑫鑫郇悅
OwnerNORTH CHINA ELECTRIC POWER UNIV (BAODING)