Communication pipeline man hand hole downhole operation construction method
A construction method and communication pipeline technology, applied in the field of communication, can solve the problems that cannot be blown, construction workers are vulnerable to collapse, lack of settlement of manpower holes, etc., and achieve the effect of ensuring safe operation, high stability and safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0022] In order to deepen the understanding of the present invention, the present invention will be further described below in conjunction with the examples, which are only used to explain the present invention, and do not constitute a limitation to the protection scope of the present invention.
[0023] A construction method for downhole operation of manholes for communication pipelines, comprising the following steps:
[0024] Step 1: According to the manhole hole construction standard, judge whether there is any conflict between the manpower hole construction position and the original municipal infrastructure in the construction area, and then retest the manpower hole construction axis, position and elevation according to the manpower hole construction standard, and check the manpower Whether the construction position of the hole meets the design requirements;
[0025] Step 2: Use ramming equipment to ram the foundation within a radius of 2 meters where the manhole is locat...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com