Locally-reinforced embankment, construction method and quick repairing and reinforcing method of locally-reinforced embankment
A technology for reinforcing embankments and embankments, applied in the directions of roads, roads, buildings, etc., can solve the problems of increasing engineering volume and waste of resources, and achieve the effects of saving time and cost, saving costs and optimizing resources.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0057] For the construction method of the above-mentioned partially reinforced embankment, be familiar with the design documents before construction and do a good job of on-site verification. According to the survey data and design documents, make a timely organizational design, including construction methods, resource allocation, etc., and then carry out basic engineering construction and component production. According to the design and specification requirements, pave the embankment 1, pave the filler and use local materials, environmental protection, economy, and specific It includes the following steps:
[0058] Step A: The roadbed site is processed, leveled and compacted to meet the design and specification requirements. The embankment 1 is laid with filler, and the filler is laid according to the actual position of the construction line during the laying process, and the filler is layered and compacted. When the filler is laid, a certain thickness of expansive soil filler ...
Embodiment 2
[0064] The above-mentioned method for rapid repair and reinforcement of partially reinforced embankments specifically includes the following steps:
[0065] Step a: Determine the damaged location of the embankment 1. According to the damage of the embankment 1, excavate the slope where the sliding damage occurs under the first reinforcement unit 2 at the damaged location, and the depth of excavation should reach slip. The location of the face;
[0066] Step b: Backfill and compact the excavated side slope layer by layer, and achieve a compactness that meets the specifications. After compaction is completed, drill holes perpendicular to the slope of the embankment 1 until the slide is drilled. Below shift
[0067] Step c: Pass the anchor rod 13 through the hole, and place the end of the round top plate 9 of the anchor rod 13 at the end of the hole drilled in the step b located inside the embankment 1, and the anchor rod 13 A first connecting hole 10 is opened at the center of the ci...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com