Prefabricated assembly type grating energy dissipation inspection well and sewage system suitable for being laid in riverway

A prefabricated and sewage system technology, applied in waterway systems, sewer systems, water/sewage treatment, etc., can solve problems such as obstruction of river flooding, decline in sewage concentration, dissatisfaction, etc., to prevent river backflow and eliminate head difference. , the effect of improving the assembly rate

Pending Publication Date: 2020-05-19
重庆市市政设计研究院有限公司
View PDF1 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] 1. Does not consider the sealing requirements of inspection wells (such as Figure 8 As shown), when the river water rises, it flows backward into the main sewage pipe, causing mixed river water in the sewage pipe, resulting in a decrease in the concentration of sewage in the main sewage pipe, which does not meet the "Three-Year Action Plan for Quality and Efficiency Improvement of Urban Sewage Treatment (2019-2021)" 》Requirements on the concentration of biochemical oxygen demand (BOD) in the influent of urban sewage treatment plants not less than 100mg / L;
[0004] 2. The flood discharge function of the river is not considered (such as Figure 9 As shown), the inspection well is higher than the flood level of the river, and when the water level of the river rises during the flood, the inspection well hinders the flood discharge of the river;
[0005] 3. The ventilation pipe of the main sewage pipe inspection well is not higher than the flood level (such as Figure 10 As shown), the river water backflows into the main sewage pipe at the flood level, causing mixed river water in the sewage pipe, and the sewage concentration in the main sewage pipe decreases, which does not meet the "Three-year Action Plan for Quality and Efficiency Improvement of Urban Sewage Treatment (2019-2021)" 》About the requirement that the influent biochemical oxygen demand (BOD) concentration of urban sewage treatment plants should not be lower than 100mg / L
Considering the safety of personnel entering and repairing, traditional drop wells generally use two well chambers—the entry well chamber and the water inlet well chamber, which have the disadvantages of being large and hindering the flood discharge of the river; the drop wells use concrete cast-in-place technology, which has the disadvantage of requiring on-site pouring , such as a kind of energy-dissipating sewage intercepting type drop well device disclosed in Chinese patent application with publication number CN109339200A

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Prefabricated assembly type grating energy dissipation inspection well and sewage system suitable for being laid in riverway
  • Prefabricated assembly type grating energy dissipation inspection well and sewage system suitable for being laid in riverway
  • Prefabricated assembly type grating energy dissipation inspection well and sewage system suitable for being laid in riverway

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0043] The present invention will be further described below in conjunction with drawings and specific embodiments, so that those skilled in the art can better understand the present invention and implement it, but the examples given are not as limitations of the present invention.

[0044] Such as figure 1 As shown, it is a structural schematic diagram of an embodiment of the sewage system suitable for laying in a river course according to the present invention. The sewage system suitable for laying in the river course of the present embodiment includes the main sewage pipe 12 buried in the river course, and the main sewage pipe 12 is provided with prefabricated assembled grid energy dissipation inspection wells 13 at intervals. The prefabricated and assembled grid energy-dissipating inspection well of this embodiment includes an inspection well body 1, and the inspection well body 1 is provided with an upper well chamber 2 located above and a lower well chamber 3 located belo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a prefabricated assembly type grating energy dissipation inspection well. The prefabricated assembly type grating energy dissipation inspection well comprises an inspection well body, an upper-layer well chamber located on the upper part and a lower-layer well chamber located on the lower part are arranged in the inspection well body, and at least one layer of energy dissipation grating is arranged between the upper-layer well chamber and the lower-layer well chamber; and a water inlet pipe connector and a vent pipe connector are arranged in the upper-layer well chamber, and an upstream connector and a downstream connector which are used for installing a sewage main pipe are arranged in the lower-layer well chamber. The invention further discloses a sewage system suitable for being laid in the riverway; the the sewage system comprises the sewage main pipe buried in the riverway, the prefabricated assembly type grating energy dissipation inspection wells are arranged on the sewage main pipe at intervals, the inspection well body is closed, and a drainage vertical pipe is connected with the water inlet pipe connector; and a vent pipe is connected with the ventpipe connector, the upstream connector and the downstream connector are connected with the sewage main pipe, and the sewage main pipe and the prefabricated assembly type grating energy dissipation inspection well are both located below the flood level of the riverway.

Description

technical field [0001] The invention belongs to the technical field of municipal engineering, in particular to a prefabricated and assembled grid energy dissipation inspection well and a sewage system suitable for laying in river courses. Background technique [0002] Main sewage pipes do not have the implementation conditions for bank embedding and must be installed in river courses in many cases. The existing sewage systems suitable for laying in river courses mainly have the following problems: [0003] 1. Does not consider the sealing requirements of inspection wells (such as Figure 8 As shown), when the river water rises, it flows backward into the main sewage pipe, causing mixed river water in the sewage pipe, resulting in a decrease in the concentration of sewage in the main sewage pipe, which does not meet the "Three-Year Action Plan for Quality and Efficiency Improvement of Urban Sewage Treatment (2019-2021)" 》Requirements on the concentration of biochemical oxyge...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E03F3/02E03F3/04E03F5/02E03F5/14E02D29/14
CPCE02D29/14E03F3/02E03F3/04E03F5/02E03F5/021E03F5/022E03F5/14
Inventor 敖良根吕波古霞何强陈一古励黄炜曦蒲贵兵蔡岚王书敏潘伟亮陈垚黄恒粤郭富成杨祥宇
Owner 重庆市市政设计研究院有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products