Interface primary support system for auxiliary transverse channel of mined metro station and construction method
A technology of subway stations and construction methods, applied in tunnels, tunnel linings, underground chambers, etc., can solve the problems of unguaranteed construction quality of three-dimensional steel frames, high processing accuracy, and inability to prevent temporary exposure of suspended surfaces, etc., to achieve improved processing The effect of accuracy requirements and processing difficulty, shortening construction period, and reducing operation risk
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] This embodiment further elaborates the present invention in combination with the construction method of the underground excavation station of Qingdao Line 4, the on-site implementation of the portal interface and the patent drawings.
[0044] Such as figure 1 As shown, the primary support system of the interface of the submerged cross passage of the submerged subway station in this embodiment includes the primary support system of the station tunnel pick-up plate, the primary support 2 of the auxiliary tunnel and the additional portal system inside the interface.
[0045] The additional portal support system includes the additional portal steel frame 3 and the primary support sprayed concrete, the vertical support steel frame 10 between the additional portal and the initial support of the pick-up plate, the advance support pipe shed 6, and the expansion shell anchor of the initial support of the pick-up plate pole 7.
[0046] The station tunnel should select the approp...
Embodiment 2
[0057] Such as Figure 4 As shown, the construction method of the primary support system in this embodiment, the difference between this embodiment and Embodiment 1 is only in the excavation stage of variable section of the station tunnel at the interface of step (1): the station tunnel is excavated according to the existing method ,Such as figure 2 As shown in the figure, assuming that the station tunnel’s standard cross-section initial support outline 11 steel frame to the outer contour of the interface portal ≥ 1.5m when the station tunnel pick-up plate initial support expansion excavation range, according to the interface portal span is higher than the straight point 8 to start the expansion excavation The outline of the initial support 1 of the slab-type station tunnel adjusts the arc of the station arch on the side of the gate to the initial straight wall 4 of the station tunnel, and the additional gate can invade the range of the secondary lining structure 5 of the sub...
Embodiment 3
[0059] In the construction method of the initial support system of this embodiment, in step (1), if the surrounding rock is poor, the outline of the initial support 1 of the pick-up type station tunnel is not applied, and the straight point 8 of the initial support of the station tunnel is taken. Arc-shaped excavation is carried out along the outline of the original branch of the station tunnel to ensure the stress on the arch of the tunnel and control the settlement. The rest are the same as those in Embodiment 1 or 2.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com