Project cost progress management control system and method based on big data
A technology for project cost and progress management, applied in data processing applications, commerce, instruments, etc., can solve the problems of time-consuming project cost evaluation, prone to calculation errors, and low calculation efficiency, so as to save time and accuracy of project cost evaluation High, computationally efficient effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0085] The big data-based project cost schedule management and control method provided by the embodiment of the present invention is as follows: figure 1 As shown, as a preferred embodiment, such as image 3 As shown, the method for calculating the project cost through the cost calculation program combined with the budget data provided by the embodiment of the present invention includes:
[0086] S201. Obtain engineering raw data through engineering equipment.
[0087] S202. Extract project cost budget information matching the project original data from a preset project cost database.
[0088] S203. Calculate a project cost budget result according to the project cost budget information and the project raw data;
[0089] S204. Generate a project cost proposal according to the project original data and the project cost budget result.
[0090] The original engineering data provided by the embodiment of the present invention includes basic engineering information, basic technic...
Embodiment 2
[0106] The big data-based project cost schedule management and control method provided by the embodiment of the present invention is as follows: figure 1 as shown in Figure 4 As shown, as a preferred embodiment, the method for analyzing the project cost through the cost analysis program provided by the embodiment of the present invention includes:
[0107] S301, making an Excel report of project cost, and completing the entry of actual cost attributes.
[0108] Wherein, the report includes multiple engineering categories, each engineering category has multiple equipment categories, each equipment category has multiple attributes, and the attributes include actual cost attributes and automatic analysis attributes;
[0109]S302. Through the project cost analysis program, query the standard cost data corresponding to each equipment category under the current project category in turn, and calculate the relative deviation value.
[0110] S303, judging the range of the relative d...
Embodiment 3
[0113] The big data-based project cost schedule management and control method provided by the embodiment of the present invention is as follows: figure 1 as shown in Figure 5 As shown, as a preferred embodiment, the method for evaluating the project cost through the cost evaluation program provided by the embodiment of the present invention includes:
[0114] S401, establishing a construction project cost evaluation index table with dimensions, types, and hierarchical relationships through the evaluation program.
[0115] S402, performing automated cost evaluation analysis on the development projects participating in the evaluation through the construction project cost evaluation index table.
[0116] S403. Automatically generate a list of doubtful points in cost evaluation corresponding to the development project according to the evaluation and analysis results.
[0117] In step S401 provided by the embodiment of the present invention, the dimensions include year and regio...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com