Mountain road grade judgment and optimization method
A technology of road grade and optimization method, applied in the field of grade, can solve the problems of impossible road research, one-sidedness of mountain roads, etc., and achieve the effect of reducing cost, wide application range and maximizing service life.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0065] Now take the fourth-grade highway in a certain mountainous area of Guangdong (the design period is 10 years, and the traffic volume growth rate in the design period is 5%) as the research object, and the present invention will be described in detail in conjunction with the accompanying drawings.
[0066] Table 4 Uneven coefficient of daily distribution of traffic volume in this area
[0067] on Monday Tuesday Wednesday Thursday friday Saturday sunday average K wi
1.00 1.02 1.02 1.02 1.02 0.98 0.94 1
[0068] Step 1: Assume that the Class 4 highway will be open to traffic for 3 years, then m=3; make statistics on the traffic volume change trend within 3 years after the completion of this section of road.
[0069] Table 5 The trend of traffic volume change within m years
[0070] January February March April May June July August September October November December 1st year 11238 12567...
Embodiment 2
[0083] The next case will be calculated as an example (four-level road single lane)
[0084] Taking the fourth-class highway (single-lane) in a mountainous area of Guangdong as the research object, the present invention will be described in detail in conjunction with the accompanying drawings.
[0085] Step 1: The Class 4 highway will be open to traffic for 3 years, then m=3; make statistics on the traffic volume change trend within 3 years after the completion of this section of road.
[0086] Table 7 The trend of traffic volume change in m years
[0087] January February March April May June July August September October November December 1st year 11238 12567 13489 14562 14862 13245 15075 14856 14923 14238 13241 12469 2nd year 12486 12973 13564 14851 19460 14253 14560 16258 15987 14863 14298 13956 3rd year 13950 16528 15924 16463 17681 15326 18346 16543 15847 15432 15897 14982
[0088...
Embodiment 3
[0100] The next case will be calculated as an example (two-lane four-way highway)
[0101] Taking a fourth-class highway (two-lane lane) in a mountainous area in Guangdong as the research object, the present invention will be described in detail in conjunction with the accompanying drawings.
[0102] Step 1: The Class 4 highway will be open to traffic for 3 years, then m=3; make statistics on the traffic volume change trend within 3 years after the completion of this section of road.
[0103] Table 9 Change trend of traffic volume within m years
[0104] January February March April May June July August September October November December 1st year 31846 32547 34572 34562 34862 33245 35075 34856 34923 34238 33241 29469 2nd year 32548 38425 33564 34856 37460 34253 34560 36258 35987 34863 35298 33956 3rd year 42567 46583 45924 46463 47681 45326 38346 36543 35847 35432 35897 34982
[0105] St...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com