The application discloses a kind of different types
tunnel construction clearance automatic generation method, step (1), establish standard
database, tunnel road grade,
design speed, lane number and left side maintenance road width, right side maintenance road width, left side lateral width, right side lateral width, driving lane width,
residual value one-to-one corresponding storage;Step (2), obtain the tunnel road grade,
design speed, lane number input by user, and generate standard construction clearance basic parameters by matching with standard
database;Step (3), receive the individualized parameter input by user, including left side widening value, right side widening value, emergency parking width, emergency parking lane
cross slope value, maintenance road height;Step (4), set reference point three-dimensional coordinates, based on basic parameters and individualized parameters, the three-dimensional coordinates of each feature point of construction clearance are calculated by trigonometric function;Step (5), according to the feature point coordinates,
tunnel construction clearance
graphics are automatically drawn and layer, line type and color identification are completed, and the
automation and intelligent level of
tunnel engineering design is significantly improved.