Unlock instant, AI-driven research and patent intelligence for your innovation.

Construction method for high-rise building aluminum formwork and climbing frame combined system

A construction method and technology for high-rise buildings, applied in construction, building structure, processing of building materials, etc., to achieve the effect of efficient organization, conducive to efficient construction, and reduction of technical intermittent time

Active Publication Date: 2020-12-22
CHINA CONSTR FIRST BUILDING GRP CORP LTD +1
View PDF5 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The invention provides a construction method for a high-rise building aluminum formwork climbing frame combination system, which is used to solve technical problems such as high-efficiency construction of high-rise buildings, rational utilization of resources, and improvement of space utilization

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for high-rise building aluminum formwork and climbing frame combined system
  • Construction method for high-rise building aluminum formwork and climbing frame combined system
  • Construction method for high-rise building aluminum formwork and climbing frame combined system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0037] Taking a high-rise concrete residence as an example, the construction is carried out through the high-rise building aluminum formwork climbing frame combination system, combined with Figure 1 to Figure 8 As shown, the specific steps are as follows:

[0038]Step 1. Deepen the building structure, aluminum formwork 9 and climbing frame 13, and form a deepening list for the confirmed deepening content; the structural deepening in the building is divided into three parts: vertical component deepening, horizontal component deepening, and peripheral structure 3 deepening; aluminum Die 9 is deepened to make mold matching design for aluminum formwork 9 on the standard layer and non-standard floor respectively; Climbing frame 13 deepens the technology of climbing frame 13 machine positions, overall protection, climbing frame 13 and aluminum formwork 9 boards and vertical transportation equipment Coordinate and deepen the design of the hanging basket 15 and suspension mechanism 1...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method for a high-rise building aluminum formwork and climbing frame combined system. The construction method comprises the following specific steps that 1, a building structure, an aluminum formwork and a climbing frame are deepened; 2, the climbing frame is assembled and applied; 3, the aluminum formwork is spliced and adjusted; 4, interpenetration construction is carried out through a full vertical face; 5, the aluminum formwork and the climbing frame are dismounted; and 6, the outer vertical face is subjected to construction and outer vertical face ending treatment construction and acceptance check. According to the construction method, the building structure is deepened in the earlier stage, so that potential quality hazards such as leakage of the outer wall and the window edge are reduced, and conditions are provided for interpenetration of the next stage of procedure; through deepening and construction arrangement of the aluminum formwork,the use of the formwork is more standardized, and on-site batch construction is facilitated; and through deepening and construction arrangement of the climbing frame, deepening design is carried out on fixing, lifting, descending, dismounting and the like of the climbing frame, and reasonable mounting position, lifting construction and later-period orderly dismounting of the climbing frame in construction are facilitated.

Description

technical field [0001] The invention belongs to the field of building construction, and in particular relates to a construction method for a high-rise building aluminum formwork climbing frame combination system. Background technique [0002] In recent years, as real estate customers have higher and higher expectations for high quality, the market competitiveness has become more and more fierce. Traditional and rough residential construction methods have long technical intervals, labor-intensive and low efficiency. Due to the waste of resources, inefficiency, and difficulty in quality assurance, it is gradually drifting away from the development trend of the times. In the existing construction, the construction drawings are deepened through BIM or other software, but this kind of deepening is mostly aimed at the deepening of the construction process of construction tools and materials, and does not target the overall structure of the building, structural installation formwor...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04G11/28E04G21/00
CPCE04G11/28E04G21/00
Inventor 谢辉王鹏辉阳浩
Owner CHINA CONSTR FIRST BUILDING GRP CORP LTD