A high-water material filling device and method suitable for gob-side entry retention

A high-water material and filling device technology, which is applied in the direction of filling materials, safety devices, mining devices, etc., can solve the problems of affecting the support quality, time-consuming, non-recyclable, etc., and achieve the effect of continuous filling operation and simple operation
CN112610262BActive Publication Date: 2021-09-07CHINA UNIV OF MINING & TECH +1

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
CHINA UNIV OF MINING & TECH
Publication Date
2021-09-07

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention discloses a high-water material filling device and method suitable for retaining roadways along gobs. A row of front hydraulic supports and rear hydraulic supports are respectively arranged on both sides of the roadway along the advancing direction of the working face and correspond to each other, and then each front Both the hydraulic support and the rear hydraulic support are equipped with combined filling plates. Hang the filling bags on each combined filling plate and pass through the anchor rods, and then inject grout into the filling bags. After the front top beam retracts during the grouting process Make the filling bag gradually approach the roadway roof with the continuous injection of slurry until the roof is connected; when the slurry in the bag reaches 4MPa strength after the roof is connected, the filling operation at this position is completed; then adjust the combined filling plate and drive the front hydraulic support and The rear hydraulic support moves forward along the roadway. After completing the work of moving the frame, repeat the above filling and grouting process again to carry out the filling operation at this position; the operation is simple, and it can realize safe, efficient and continuous high The filling operation of water materials, so as to ensure the continuous stability of coal mining.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to a high-water material filling device and method suitable for gob-side entry retention, and belongs to the technical field of coal mine safety mining. Background technique

[0002] Gobside entry retaining technology has been widely used in recent years to cancel section coal pillars and improve the recovery rate of coal resources. In the existing technology, high-water materials have the advantages of large support resistance, fast resistance increase speed, moderate shrinkage, good roadway maintenance effect, simple filling process and filling equipment, and have been used in some mining areas. However, high-water materials are first injected into the filling bag in liquid form, and then solidified to form, so a support form is required to provide support for its filling and forming. The current main formwork support process is: pillars - vertical steel mesh - hanging filling bags - piercing the anchor rods and fixing the ladd...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine