Rail transit construction scheduling management system and method based on drawing board analysis and medium

A dispatching management and rail transit technology, applied in the field of rail transit construction dispatching management system based on drawing board analysis, can solve the problem that the operation area and power supply partition do not have automatic error-checking and error-correcting functions, etc., so as to improve the filling efficiency and reduce the effect of error

CN113935699APending Publication Date: 2022-01-14SHANGHAI BAOSIGHT SOFTWARE CO LTD
1 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Publication Date
2022-01-14

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention provides a rail transit construction scheduling management system and method based on drawing board analysis and a medium, and the method comprises the steps: defining a global variable of a drawing board in parameter configuration as a drawing board parameter, and assigning a value to the global variable; in drawing board analysis, according to service attribute data and the drawing board parameter, enabling a rail-mounted area and a power supply area to form a rectangular box, separately analyzing the line area data of the rail-mounted area and the power supply area, generating SVG graphs connected end to end, and displaying the SVG graphs on the drawing board; configuring the state attribute data of the rail-mounted area and the power supply area in attribute configuration; drawing construction plans in the drawing board, selecting a construction area and the power supply area according to the construction plans, generating area description according to a semantic analysis rule, displaying a conflict detection result among the construction plans on the drawing board, and monitoring the areas in real time. The functions of drawing, automatic analysis, selection and rendering of the rail-mounted area are achieved, and the method is more intuitive compared with table or character expression.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to the technical field of rail transit construction dispatching, in particular to a rail transit construction dispatching management system, method and medium based on drawing board analysis. Background technique

[0002] In the construction scheduling management of rail transit, it is necessary to fill in the construction plan. The traditional way of filling in the construction plan is mainly based on excel summary. For the operation area and power supply partition filled in text, there is no automatic error correction and error correction function. Therefore, it is necessary to improve the construction plan. Standardization and accuracy reduce the safety risks caused by artificially filling in construction plans.

[0003] The prior art related to this application is the patent document CN109118054A, which discloses a subway operation construction scheduling management system, including data storage and reader, protection area se...

Examples

Embodiment 1

[0036] In the present invention, the intelligent drawing board analysis method is applied to the construction scheduling management system in the rail transit field, such as figure 1 As shown, it includes a board parameter configuration module, a board analysis module, an area attribute configuration, a construction area board selection module, a power supply area board selection module, a conflict detection board, and a construction monitoring board module. The present invention introduces the intelligent drawing board function into the construction scheduling management system, extracts the rail transit construction area involved in the construction as an optional graphic element, and extracts drawing elements of the drawing board as predefined parameters, and calls the drawing board analysis and drawing module algorithm , automatically renders the visual rendering of the track area of ​​the rail transit line as a map.

[0037] In the board parameter configuration, pre-defin...

Embodiment 2

[0056] Embodiment 2 can be regarded as a preferred example of Embodiment 1. The method of rail transit construction scheduling management based on drawing board analysis described in embodiment 2 utilizes the rail transit construction scheduling management system based on drawing board analysis described in embodiment 1.

[0057] The invention can realize standardized selection of construction areas in construction scheduling. Due to the binding between graphic elements and metadata, the risk of filling in the construction area is greatly reduced, the accuracy and standardization of the construction plan area are improved, and the automatic introduction of the power supply area is realized through the association between the construction area and the power supply area. And it can be visually displayed on the drawing board for easy checking. In addition, the conflict detection board can visually display the areas where conflicts occur, and the real-time monitoring board ca...