Kindergarten project cost index system method, device and equipment
A technology of engineering cost and index system, which is applied in the field of engineering cost, can solve problems such as inability to coordinate construction cost data, and achieve the effect of accurate budgeting
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0086] Embodiment 1, with reference to figure 1 and figure 2 , this embodiment provides a kind of kindergarten engineering cost index system method, and the operation terminal implements the kindergarten engineering cost index system method by running a program.
[0087] Described kindergarten engineering cost index system method comprises steps:
[0088] Step S1: The operating terminal determines raw material cost data according to the construction progress requirements and the selected raw materials.
[0089] Step S11: The operation terminal predicts the construction period of the building construction according to the total engineering quantity of the building construction and the planned construction quantity completed on each construction day.
[0090] For different building constructions, according to the actual construction needs, the building construction can be divided into different construction stages. For example, during the construction of a kindergarten, it is...
Embodiment 2
[0138] Embodiment 2, with reference to Figure 8 , the kindergarten engineering cost index system device provided in this embodiment can be realized by software, Figure 8 Shown in the nursery school project cost index system device in memory 2, it can be the software of forms such as program or plug-in, comprise following software module:
[0139] Raw material cost data determination module 21, equipment cost data determination module 22, building installation cost data determination module 23, total cost data determination module 24, cost data comparison module 25 and cost data adjustment module 26, these modules are logical, so according to The implemented functions can be combined or further divided arbitrarily, and the functions of each module will be described below.
[0140]In some other embodiments, the kindergarten project cost index system device can be implemented in a combination of software and hardware. As an example, the kindergarten project cost index system d...
Embodiment 3
[0142] Embodiment 3, with reference to Figure 8 , this embodiment provides an electronic device, including a memory 2 for storing executable instructions. The processor 1 is used to execute the executable instructions stored in the memory, so as to realize the method of the kindergarten project cost index system described in Embodiment 1.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com