Slope afforesting method
A technology for slopes and slopes, applied in the greening field of stone slopes or slopes, can solve the problems of low greening rate, high cost, complicated operation, etc., and achieve the effect of simple operation, cost reduction, and highlighting substantive features
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0014] The best greening method for implementing the slope or slope of the present invention will be described in detail below with reference to the accompanying drawings.
[0015] 1. Finish the slope
[0016] Such as figure 1 As shown, it is generally required that the slope ratio H / D≤1 / 0.5.
[0017] There are the following requirements for slope 1:
[0018] (1) Slope 1 cannot appear sharp or vertical;
[0019] (2) When pits or small-area inverted edges appear locally on the slope surface 1, block stones shall be used to embedding them, pre-buried U-shaped steel nails, interspersed with steel bars, and poured with concrete;
[0020] (3) The top of the slope must have a water guide ditch 11 to prevent the water flow at the top of the slope from scouring the slope surface 1, such as figure 2 shown.
[0021] 2. Fix the short U-shaped steel nail and fix the iron wire on it
[0022] Such as figure 1 As shown, a short U-shaped steel nail 2 with a length of 5-8 cm is fixed o...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com