The invention discloses an overpass existing large
karst subsidence area
station foundation
pit water inrush risk disposal method which comprises the following steps: S1, according to a ground water outlet point in a foundation pit, determining an underground
water seepage point, and determining an underground
water seepage path; s2, holes are drilled in the peripheries of all the underground
water leakage points, grouting is conducted to form a
water stop wall, and water power supply in the foundation pit is
cut off; s3, if the underground
water leakage point determined in the step S1 is close to the underground diaphragm wall, a waterproof curtain is constructed at the position, corresponding to the leakage point, outside the foundation pit, and water power supply outside the foundation pit is reduced; and S4, holes are drilled in the peripheries of all the underground
water leakage points, and waterborne
polyurethane grouting materials are injected into the holes. According to the method, the problem of pit bottom sudden water gushing occurring during excavation of the underground diaphragm wall foundation pit without bottom detection under the condition of the strong
karst development stratum can be solved, the risk of foundation pit construction within the
karst cave range is reduced, and the safety of ground surface buildings within the karst
cave influence range is guaranteed.