A production process of a membrane heater with dual functions of hot water and steam
A technology of membrane heater and hot water steam is applied in the field of production technology of membrane heater, which can solve the problems of poor sealing of membrane heating pipe, low production efficiency, short service life, etc., and achieves smooth continuous flow and production The effect of high efficiency and long service life
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] see Figure 1-3 , the present invention provides a technical scheme: a production process of a membrane heater with dual-purpose functions of hot water and steam, comprising the following steps:
[0024] S1. The diversion tube 1 is expanded or punched so that the outer wall of the diversion tube 1 has outwardly protruding diversion protrusions 2;
[0025] S2, welding the openings at both ends of the diversion tube 1 with a head 3, so that a closed cavity is formed inside the diversion tube 1;
[0026] S3. The welded guide tube 1 is nested in the heating base tube 4 for assembly and positioning by a tooling fixture, and a layer of lubricating oil is brushed on the outer surface of the heating base tube 4 to prevent the product during the subsequent stretching and extrusion process. The surface is scratched, which affects the subsequent coating of the electric heating film; after the assembly and positioning, the guide tube 1 and the heating base tube 4 are placed in the...
Embodiment 2
[0033] see Figure 1-3 , the present invention provides a technical scheme: a production process of a membrane heater with dual-purpose functions of hot water and steam, comprising the following steps:
[0034] S1. The diversion tube 1 is expanded or punched so that the outer wall of the diversion tube 1 has outwardly protruding diversion protrusions 2;
[0035] S2, welding the openings at both ends of the diversion tube 1 with a head 3, so that a closed cavity is formed inside the diversion tube 1;
[0036] S3. The welded guide tube 1 is nested in the heating base tube 4 for assembly and positioning by a tooling fixture, and a layer of lubricating oil is brushed on the outer surface of the heating base tube 4 to prevent the product during the subsequent stretching and extrusion process. The surface is scratched, which affects the subsequent coating of the electric heating film; after the assembly and positioning, the guide tube 1 and the heating base tube 4 are placed in the...
Embodiment 3
[0043] see Figure 1-3 , the present invention provides a technical scheme: a production process of a membrane heater with dual-purpose functions of hot water and steam, comprising the following steps:
[0044] S1. The diversion tube 1 is expanded or punched so that the outer wall of the diversion tube 1 has outwardly protruding diversion protrusions 2;
[0045] S2, welding the openings at both ends of the diversion tube 1 with a head 3, so that a closed cavity is formed inside the diversion tube 1;
[0046] S3. The welded guide tube 1 is nested in the heating base tube 4 for assembly and positioning by a tooling fixture, and a layer of lubricating oil is brushed on the outer surface of the heating base tube 4 to prevent the product during the subsequent stretching and extrusion process. The surface is scratched, which affects the subsequent coating of the electric heating film; after the assembly and positioning, the guide tube 1 and the heating base tube 4 are placed in the...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


