5results about How to "Efficient and fast construction" patented technology

Waterproof diversion blind ditch structure of diaphragm wall joint

The utility model relates to a waterproof flow guide blind ditch structure at the connecting place of diaphragm wall, it includes flow guide blind ditch main part, flow guide blind ditch main part sets up at the connecting place of diaphragm wall, is used for guiding the ground water flow, prevents the ground water and accumulates at the connecting place, the utility model discloses a flow guide blind ditch is established, effectively guides the ground water flow, prevents the ground water and accumulates at the connecting place, reduces the seepage risk, improves the overall waterproof performance of diaphragm wall, guarantees the engineering quality. The application still has the advantages such as convenient construction, low cost, can satisfy the efficient and economic demand of modern underground engineering construction.
Owner:SHANGHAI BAOYE GRP CORP +1

Assembly precision control method and system for variable-section spatial angle steel components

Provided is a method and system for controlling the assembly precision of variable-section space angle steel components, comprising the following steps: detecting a frame platform - marking the frame platform - installing the system on the frame platform - fine-tuning the system - secondary fine-tuning of the system after the steel tower components are in place - segment assembly - system dismantling and reuse of the system. The present invention solves the problems of low efficiency, large amount of consumables, high damage, low versatility, high labor and machine consumption for disassembly and assembly, and potential safety hazards in existing segment manufacturing methods and tooling; the system has accurate precision control, wide adaptability, high reuse rate, convenient operation, and good safety; it can be used for the assembly and precision control of various variable-section space angle steel components, while ensuring manufacturing precision, increasing production efficiency by two times, reducing tooling costs by 50%, and significantly reducing costs and increasing efficiency; positioning, assembly and adjustment are convenient and quick; each link can save labor and machinery use, and help to efficiently complete construction tasks.
Owner:CHINA RAILWAY BAOJI BRIDGE GROUP CO LTD

An integrated low-water-resistance pipeline valve assembly system for equipment outlets

ActiveCN224622333UAvoid cumbersome connectionsreduce resistance
This utility model discloses an integrated low-flow-resistance pipeline valve assembly system for equipment outlets, including a support frame, a main pipe, a connecting pipe, an outlet pipe, valve assemblies, and instrument assemblies. The main pipe is fixed on the support frame; the first end of the connecting pipe connects to the inner cavity of the main pipe; the angle between the axis of the connecting pipe and the axis of the main pipe is 40-60°; the first end of the outlet pipe is fixed to the second end of the connecting pipe; the second end of the outlet pipe connects to the equipment; the valve assembly includes multiple low-flow-resistance valves and is fixed on the connecting pipe; the instrument assemblies are fixed on the connecting pipe or the outlet pipe. This utility model adopts a prefabrication assembly method, avoiding the cumbersome on-site pipeline connection, and making construction efficient and quick; by replacing the traditional right-angle elbow with a connecting pipe, water flow resistance can be reduced, fluid dynamics performance can be optimized, and kinetic energy loss during fluid turning can be reduced, thereby reducing water resistance and lowering the energy consumption of the equipment.
Owner:CHINA CONSTRUCTION THIRD BUREAU GROUP BEIJING CO LTD +1

Construction method for preventing light partition wall from cracking

The invention discloses a construction method for preventing a light partition wall from cracking, and relates to the technical field of building construction, the construction method comprises the following steps: S1, preparation work: determining a mounting position and size, and preparing tools and materials; s2, measuring and marking: marking the position and the height of the partition wall on the wall; s3, a partition plate wall is installed, specifically, the partition plate wall is fixed to the wall body through hot-dip galvanized flat steel; s4, connecting treatment is conducted, specifically, rust prevention treatment is conducted on the connecting position of the two partition walls, and then steel angle welding positions are covered with team cloth and then covered with glass fiber gridding cloth; s5, cleaning the site; the construction process is simplified, the working efficiency is remarkably improved, common quality problems such as cracks are effectively reduced, construction is faster and more efficient, and meanwhile it is ensured that the project quality reaches the higher standard.
Owner:CHINA METALLURGICAL CONSTR ENG GRP

High-altitude construction device for bridge operation and control method thereof

The invention relates to the technical field of buildings, and discloses a high-altitude construction device for bridge operation, which comprises a construction frame body, a construction platform, a guardrail plate body, an indication assembly and a controller assembly. The construction frame body is of a movable trapezoidal structure; the construction platform is arranged at the top of the construction frame body, and the construction platform is of a telescopic structure; the guardrail plate bodies are arranged in pairs, the paired guardrail plate bodies are arranged corresponding to the two opposite side walls of the construction platform respectively, and the guardrail plate bodies are rotationally connected with the construction platform; the indication assembly is movably arranged on the construction platform; the controller assembly is connected with the construction platform, the guardrail plate body and the indication assembly. According to the construction method, diversified construction requirements for the bottom of the bridge are met, the influence on road traffic in the construction process can be effectively reduced, and the construction efficiency and the safety of construction operation are improved. The invention further provides a control method of the high-altitude construction device for bridge operation.
Owner:TIANYUAN CONSTR GROUP +2