Forecasting method of water level of potamic tidewater
A prediction method and water level technology, applied in the field of automation, can solve problems such as weakening high-dimensional nonlinear mapping relationships
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0016] For the tidal water level prediction of a hydrological station in the Qiantang River, the specific implementation steps are as follows:
[0017] Step (1). Construct a neural network model based on the neural network function in the toolbox function library of MATLAB 6.5 and the historical data of the Qiantang River tide water level and time. The specific method is:
[0018] ① Obtain the hydrological data of 1410 groups of tidal water level in 1990 at a hydrological station on the Qiantang River. Tide water level and time data There are four sets of data in a normal day, which are the time and water level value of the high tide level of the daily tide, the time and water level value of the low tide level of the daily tide, the time and water level value of the high tide level of the night tide, and the low tide level of the night tide. time and water level values. Divide these N groups of data into two groups before and after, the front data group is 1000 groups of tra...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com