Resource scheduling method and base station
A resource scheduling and base station technology, which is applied to electrical components, wireless communication, transmission systems, etc., can solve the problems of slow scheduling execution speed, high computational complexity, and increased computational load, so as to shorten scheduling time and reduce scheduling complexity Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention more clear, the embodiments of the present invention will be further described in detail below in conjunction with the accompanying drawings.
[0025] The proportional fair scheduling algorithm is based on priority, that is, when the transmission time interval (TTI) is t, resources are allocated to user v satisfying the following formula:
[0026] v = arg max ( C / I ) k R k ( t - 1 ) (Formula 1)
[0027] Among them, C / I represents the ratio of signal strength to interference strength, that is, the carrier-to-interference ratio, so (C / I) k I...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com