Loess tunnel construction method
A technology of loess tunnel and construction method, which is applied in the direction of tunnel, tunnel lining, earthwork drilling, etc. to ensure the stability of the tunnel structure, control the settlement of the arch, and solve the effects of early cracking
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0038] The construction method of the loess tunnel of the present invention is: "quick excavation, quick support, quick closure, the inverted arch and the secondary lining side wall foundation follow closely, and the secondary lining is applied in due course".
[0039] Quick digging refers to quick excavation.
[0040] Fast support means that the initial support should be constructed in time.
[0041] Fast closure refers to the erection of inverted arch trestles, and the timely implementation of initial support for inverted arches, so that the initial support forms a closed force-bearing whole.
[0042] The follow-up measures of the inverted arch and the secondary lining side wall foundation refer to erecting the inverted arch trestle, backfilling the inverted arch and constructing the low side wall as soon as possible, so that the foundation supporting the upper primary support is changed from point force to surface force The backfilling of the inverted arch also reduces the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com