A roadway support system and method for gob-side entry retention in three-soft coal seam mining without coal pillars
A technology with three soft coal seams and no coal pillars, which is applied to mine roof supports, mining equipment, earthwork drilling, etc. Difficulty and labor intensity, long maintenance-free period, and improved maintenance period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0054] This embodiment takes the test mine located in the Weibei mining area as an example:
[0055] The pilot mine is located in the Weibei mining area, which belongs to the three-soft coal seam. The existing gob-side entry retaining technology without coal pillar mining has no obvious effect, the roadway section is difficult to maintain, the volume of the bottom drum is large, and the support body in the roadway, such as ordinary monomer , The damage rate of U-shaped steel gangue column is high, the supporting effect is difficult to guarantee, and the construction is difficult.
[0056] In view of the current situation of the existing three-soft coal seam without coal pillar goblind roadway support, this embodiment provides a three-soft coal seam without coal pillar mining goblin On the basis of the original anchor net and cable support 15, special strengthening support measures are adopted, and it has the effects of high support strength and high safety for the roof and flo...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com